NOZZLE,SAFETY VALVE,MODEL FS613,SS316

Material 4100069634 · NOZZLE · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100069634
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 13 FuncLocs A/B, 13 safety/shutdown valve)
Supplier
KARYA SARANA GLOBAL PT
Lead time
129 d · P80 177 d
Unit price
Rp 6.5M

Recommendation

  • 1.Safety-critical element: installed on 13 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 3.5 EA/year: 3.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~129 days; expected demand during lead time 1.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 10.
  • 5.On hand 0 + on order 7 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 177 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 13 FuncLoc(s), 4 of them criticality A/B.
  • 8.ML early warning: 53% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 19.6M · order by 01 Oct 2026
Expected arrival ≈ 129 days
Safety-critical (SCE)Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 7
next delivery 08 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
10
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.5M
PO history
ML early warning: 53% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 159 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 13 functional locations

4 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1448A
SAFETY VALVE VD-664B
A200.04
PX_PRV-1606B
SAFETY VALVE HE-1422A
A100.04
PX_PRV-305
SAFETY VALVE VD-996
A100.04
PX_PRV-544A
SAFETY VALVE PP-598B
A100.04
PX_PRV-1360B
SAFETY VALVE PP-1171
C200.04
PX_PRV-822
SAFETY VALVE PP-1471A
C100.04
PX_PRV-887
SAFETY VALVE HE-826
S131.33
PX_PRV-1439D
SAFETY VALVE KC-372D
S100.04
PX_PRV-1854A
SAFETY VALVE VD-1695D
S100.04
PX_PRV-243
SAFETY VALVE PP-442A
S100.04
PX_PRV-275
SAFETY VALVE KC-717
S100.04
PX_PRV-463C
SAFETY VALVE VD-123A
S100.04

Lead time and procurement

Lead time 129 ± 50 days (PO history + category, 2 PO lines) · on-time 18%

PR dateTypeQtyUnit priceDeliveryLead time
04 Aug 2026PR06
Regular replenishment
3Rp 6.5M06 Jan 2027
open
155 d
03 Aug 2026PR06
Regular replenishment
1Rp 6.5M08 Dec 2026
open
127 d
01 Nov 2025PR05
Project / turnaround
3Rp 6.9M08 Feb 2028
open
829 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Feb 2026MediumPX_PRV-887Replace lamp as per PM finding
26 Jan 2026LowPX_PRV-887PRV-887 passing
25 Jun 2025MediumPX_PRV-887PRV-887 passing

Recent goods issues

Posting dateQtyOrderOrder type
25 Apr 20261201000008643Corrective
05 Feb 20262201000010658Corrective
25 Dec 20252201000011308Corrective
25 Dec 20251201000011308Corrective
07 Dec 20251201000037821Corrective