NOZZLE,SAFETY VALVE,TYPE UO887,A182F11

Material 4100069671 · NOZZLE · Plant 1000

ASafety-criticalReorderCriticalStockout
Material
4100069671
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 10 FuncLocs A/B, 10 safety/shutdown valve)
Supplier
No PO history
Lead time
121 d · P80 177 d
Unit price
Rp 20.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 10 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~121 days; expected demand during lead time 0.4.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 6.Installed on 10 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 81.1M · order by 01 Oct 2026
Expected arrival ≈ 121 days
Safety-critical (SCE)Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.9%
stockout risk now 35%
Unit price
Rp 20.3M
Category + unit estimate
ML early warning: 24% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 239 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 10 functional locations

3 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1226
SAFETY VALVE PP-483B
A100.04
PX_PRV-913
SAFETY VALVE HE-1593C
A100.04
PY_PRV-319
SAFETY VALVE VD-538A
A100.04
PX_PRV-1154B
SAFETY VALVE PP-1765B
C100.04
PX_PRV-489B
SAFETY VALVE PP-1106A
S172.18
PX_PRV-1224
SAFETY VALVE VD-531
S100.04
PX_PRV-1661B
SAFETY VALVE KC-426D
S100.04
PX_PRV-182
SAFETY VALVE PP-507
S100.04
PX_PRV-478A
SAFETY VALVE CL-1290
S100.04
PX_PRV-644A
SAFETY VALVE VD-855B
S100.04

Lead time and procurement

Lead time 121 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026LowPX_PRV-489BRepair insulation PRV-489B
10 Jun 2026LowPX_PRV-489BPRV-489B simmering
13 Dec 2025MediumPX_PRV-489BRecertification PRV-489B
20 Oct 2025HighPX_PRV-489BLeak from packing
08 Oct 2025LowPX_PRV-489BInstall scaffolding at PRV-489B
29 Sept 2025MediumPX_PRV-489BPRV-489B passing
09 May 2025MediumPX_PRV-489BRecertification PRV-489B

Recent goods issues

Posting dateQtyOrderOrder type
04 Feb 20261201000000993Corrective
16 Dec 20251201000009093Corrective
25 May 20251205000001252Other maintenance