NOZZLE,SAFETY VALVE,MODEL AJ880,SS304

Material 4100069683 · NOZZLE · Plant 1000

CSafety-criticalLong-leadReorderNormalSlow-moving
Material
4100069683
Category
NOZZLE
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 5 FuncLocs A/B, 5 safety/shutdown valve)
Supplier
GUNUNG UTAMA LESTARI PT
Lead time
142 d · P80 190 d
Unit price
Rp 48.4M

Recommendation

  • 1.Safety-critical element: installed on 5 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~142 days; expected demand during lead time 0.6.
  • 4.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 5.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
  • 6.Long lead time: 80% of deliveries took up to 190 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
4 EA
Rp 193.7M · order by 01 Oct 2026
Expected arrival ≈ 142 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.5%
stockout risk now 5%
Unit price
Rp 48.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 284 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 5 functional locations

0 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PRV-358
SAFETY VALVE PP-1337
C200.04
PX_PRV-1044B
SAFETY VALVE KC-426D
S110.04
PX_PRV-100A
SAFETY VALVE VD-557
S400.04
PX_PRV-1758
SAFETY VALVE PP-486B
S400.04
PY_PRV-1778
SAFETY VALVE KC-675
S100.04

Lead time and procurement

Lead time 142 ± 68 days (PO history, 4 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
22 Sept 2025PR03
Regular replenishment
1Rp 47.6M21 Jan 2026121 d
30 Jul 2025PR03
Regular replenishment
1Rp 49.2M07 Nov 2025100 d
18 Jul 2025PR03
Regular replenishment
1Rp 47.6M22 Apr 2026278 d
31 May 2025PR06
Regular replenishment
2Rp 50.1M09 Oct 2025131 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 May 2025MediumPX_PRV-1044BInstall scaffolding at PRV-1044B

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 20252201000009100Corrective
21 Dec 20251201000009100Corrective
08 Nov 20251201000004106Corrective
13 Sept 20251201000025143Corrective