NOZZLE,SAFETY VALVE,SIZE CH112,MONEL
Material 4100069722 · NOZZLE · Plant 1000
CSafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100069722
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 3 FuncLocs A/B, 3 safety/shutdown valve)
- Supplier
- LANGIT MESINDO GLOBAL PT
- Lead time
- 111 d · P80 140 d
- Unit price
- Rp 7.3M
Recommendation
- 1.Safety-critical element: installed on 3 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~111 days; expected demand during lead time 0.6.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
- 5.On hand 0 + on order 0 is at or below the reorder point: order 7 now.
- 6.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
7 EA
Rp 51.0M · order by 01 Oct 2026
Expected arrival ≈ 111 days
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
99.9%
stockout risk now 32%
Unit price
Rp 7.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 36 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1436 SAFETY VALVE PP-278 | C | 1 | 0 | 0.04 |
| PX_PRV-761 SAFETY VALVE PP-1011D | S | 1 | 2 | 0.90 |
| PX_PRV-1201 SAFETY VALVE HE-1502B | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 111 ± 58 days (PO history, 4 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 May 2026 | PR06 Regular replenishment | 2 | Rp 7.6M | 12 Jul 2026 | 71 d |
| 21 Sept 2025 | PR06 Regular replenishment | 2 | Rp 7.1M | 08 Nov 2025 | 48 d |
| 08 Aug 2025 | PR06 Regular replenishment | 2 | Rp 7.0M | 16 Feb 2026 | 192 d |
| 04 May 2025 | PR06 Regular replenishment | 1 | Rp 7.4M | 17 Aug 2025 | 105 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Sept 2026 | Medium | PX_PRV-761 | Recertification PRV-761 |
| 15 Jun 2025 | Medium | PX_PRV-761 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Aug 2026 | 2 | 201000039395 | Corrective |
| 03 Feb 2026 | 1 | 201000032240 | Corrective |