NOZZLE,SAFETY VALVE,SIZE CH112,MONEL

Material 4100069722 · NOZZLE · Plant 1000

CSafety-criticalLong-leadReorderCriticalStockout
Material
4100069722
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 3 FuncLocs A/B, 3 safety/shutdown valve)
Supplier
LANGIT MESINDO GLOBAL PT
Lead time
111 d · P80 140 d
Unit price
Rp 7.3M

Recommendation

  • 1.Safety-critical element: installed on 3 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~111 days; expected demand during lead time 0.6.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 7 now.
  • 6.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
7 EA
Rp 51.0M · order by 01 Oct 2026
Expected arrival ≈ 111 days
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
7
order qty 2
Service level
99.9%
stockout risk now 32%
Unit price
Rp 7.3M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 36 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1436
SAFETY VALVE PP-278
C100.04
PX_PRV-761
SAFETY VALVE PP-1011D
S120.90
PX_PRV-1201
SAFETY VALVE HE-1502B
S100.04

Lead time and procurement

Lead time 111 ± 58 days (PO history, 4 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
02 May 2026PR06
Regular replenishment
2Rp 7.6M12 Jul 202671 d
21 Sept 2025PR06
Regular replenishment
2Rp 7.1M08 Nov 202548 d
08 Aug 2025PR06
Regular replenishment
2Rp 7.0M16 Feb 2026192 d
04 May 2025PR06
Regular replenishment
1Rp 7.4M17 Aug 2025105 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_PRV-761Recertification PRV-761
15 Jun 2025MediumPX_PRV-761Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
26 Aug 20262201000039395Corrective
03 Feb 20261201000032240Corrective