NOZZLE,SAFETY VALVE,MODEL YV321,A105

Material 4100069802 · NOZZLE · Plant 1000

ASafety-criticalLong-leadReorderCriticalStockout
Material
4100069802
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 4 FuncLocs A/B, 4 safety/shutdown valve)
Supplier
DUTA MANDIRI MAKMUR PT
Lead time
117 d · P80 138 d
Unit price
Rp 42.4M

Recommendation

  • 1.Safety-critical element: installed on 4 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 2.5 EA/year: 2.5 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~117 days; expected demand during lead time 0.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 6.Long lead time: 80% of deliveries took up to 138 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 212.1M · order by 01 Oct 2026
Expected arrival ≈ 117 days
Safety-critical (SCE)Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
5
order qty 1
Service level
99.9%
stockout risk now 55%
Unit price
Rp 42.4M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 27 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1498
SAFETY VALVE VD-1188A
A100.04
PY_PRV-1171
SAFETY VALVE VD-1192
A100.04
PX_PRV-936
SAFETY VALVE VD-1936
S120.47
PX_PRV-730A
SAFETY VALVE CL-1224
S100.04

Lead time and procurement

Lead time 117 ± 45 days (PO history, 3 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
25 Nov 2025PR04
Regular (other)
1Rp 41.5M19 Apr 2026145 d
22 Oct 2025PR03
Regular replenishment
2Rp 42.9M30 Dec 202569 d
17 Oct 2025PR10
Other
2Rp 42.4M21 Feb 2026127 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Jan 2026MediumPX_PRV-936PRV-936 simmering
13 Jun 2025LowPX_PRV-936Install scaffolding at PRV-936

Recent goods issues

Posting dateQtyOrderOrder type
04 Sept 20261201000031484Corrective
03 Sept 20261201000031484Corrective
28 May 20261201000029008Corrective