Sparely
DU

NOZZLE,SAFETY VALVE,MODEL QC869,A182F11

Material 4100070816 · NOZZLE · Plant 1000

CSafety-criticalLong-leadReorderCriticalStockout
Material
4100070816
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
98 d · P80 94 d
Unit price
Rp 9.6M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~98 days; expected demand during lead time 0.2.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 5.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 6.Long lead time: 80% of deliveries took up to 94 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
3 EA
Rp 28.7M · order by 01 Oct 2026
Expected arrival ≈ 98 days
Safety-critical (SCE)Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 14%
Unit price
Rp 9.6M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 832.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1360B
SAFETY VALVE PP-1171
C100.04

Lead time and procurement

Lead time 98 ± 42 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jun 2026PR05
Project / turnaround
1Rp 9.1M27 Sept 2026112 d
17 Jan 2026PR04
Regular (other)
1Rp 9.6M24 Mar 202666 d
14 Dec 2025PR04
Regular (other)
2Rp 9.7M28 Jan 202645 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
26 Dec 20251201000011308Corrective
25 Dec 20251201000011308Corrective