NOZZLE,SAFETY VALVE,SIZE BI688,MONEL

Material 4100071072 · NOZZLE · Plant 1000

SSafety-criticalLong-leadMonitorStockout
Material
4100071072
Category
NOZZLE
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
KARYA SARANA GLOBAL PT
Lead time
137 d · P80 171 d
Unit price
Rp 12.2M

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~137 days; expected demand during lead time 0.1.
  • 4.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Long lead time: 80% of deliveries took up to 171 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 5
next delivery 18 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 12.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 338 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 235.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1140
SAFETY VALVE VD-240B
S100.04

Lead time and procurement

Lead time 137 ± 41 days (PO history, 3 PO lines) · on-time 18%

PR dateTypeQtyUnit priceDeliveryLead time
02 Sept 2026PR06
Regular replenishment
1Rp 12.2M31 Dec 2026
open
120 d
04 Jul 2026PR06
Regular replenishment
2Rp 12.3M01 Jan 2027
open
181 d
16 Jun 2026PR06
Regular replenishment
2Rp 11.5M18 Nov 2026
open
155 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
28 Oct 20251201000002952Corrective