NOZZLE,SAFETY VALVE,MODEL CO774,GRAPHITE
Material 4100071125 · NOZZLE · Plant 1000
SSafety-criticalLong-leadReorderCriticalStockout
- Material
- 4100071125
- Category
- NOZZLE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- S (0 of 1 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 123 d · P80 149 d
- Unit price
- Rp 48.3M
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~123 days; expected demand during lead time 0.5.
- 4.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 5.On hand 0 + on order 2 is at or below the reorder point: order 4 now.
- 6.Long lead time: 80% of deliveries took up to 149 days and the fastest seen in its category 69 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
Proposed purchase requisition
4 EA
Rp 193.0M · order by 01 Oct 2026
Expected arrival ≈ 123 days
Safety-critical (SCE)Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 27 Jan 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
98.7%
stockout risk now 16%
Unit price
Rp 48.3M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 22 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 753.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PRV-1661B SAFETY VALVE KC-426D | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 123 ± 45 days (PO history, 3 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Aug 2026 | PR06 Regular replenishment | 2 | Rp 47.4M | 27 Jan 2027 open | 159 d |
| 07 May 2026 | PR06 Regular replenishment | 2 | Rp 48.3M | 26 Jul 2026 | 80 d |
| 13 Sept 2025 | PR03 Regular replenishment | 1 | Rp 50.1M | 24 Jan 2026 | 133 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Sept 2026 | 2 | 201000016998 | Corrective |
| 09 Sept 2026 | 1 | 201000016998 | Corrective |