Sparely
DU

NOZZLE,SAFETY VALVE,MODEL SD826,SS304

Material 4100071233 · NOZZLE · Plant 1000

SSafety-criticalReduceSlow-moving
Material
4100071233
Category
NOZZLE
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
121 d · P80 177 d
Unit price
Rp 20.3M (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s) (equipment criticality S). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~121 days; expected demand during lead time 0.0.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 5.Stock 130 exceeds the level to keep (2) by 128.
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
130 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 20.3M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 402 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 204.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~69 days.

Installed on 2 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PRV-1052A
SAFETY VALVE CL-101
S210.04
PX_PRV-658
SAFETY VALVE KC-551D
S100.04

Lead time and procurement

Lead time 121 ± 50 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 May 2025LowPX_PRV-1052ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
25 Aug 20251201000039654Corrective