Sparely
DU

FIREBRICK,INSUL,26,76T,114W,230L

Material 4100071521 · FIREBRICK · Plant 1000

ALong-leadMonitorStockout
Material
4100071521
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (14 of 19 FuncLocs A/B)
Supplier
KARYA SEJAHTERA NUSANTARA PT
Lead time
79 d · P80 113 d
Unit price
Rp 186,830

Recommendation

  • 1.Forecast 42,409 EA/year: 42,409 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~79 days; expected demand during lead time 9,214.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 24,036, order up to 27,571.
  • 4.Long lead time: 80% of deliveries took up to 113 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 19 FuncLoc(s), 14 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 7,950Single sourceAbnormal consumptionOpen POSame description as 6 other material numbers
On hand / on order
0 / 211,871
next delivery 09 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
24,036
safety stock 14,823
Rec. Max
27,571
order qty 3,535
Service level
99.0%
stockout risk now 0%
Unit price
Rp 186,830
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 45 issue days in the last 180 days, last issue 9 days ago, 124 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 16 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (9,000 units) excluded from the baseline.

Demand pattern Smooth · 149 issue days · 34 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 77.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 19 functional locations

14 with criticality A/B · 29,358 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A40011442.86
PX_BF-106
CRACKING FURNACE BF-106
A5,0378230.86
PX_BF-112
CRACKING FURNACE BF-112
A1,5007327.01
PX_BF-102
CRACKING FURNACE BF-102
A507128.72
PX_BF-103
CRACKING FURNACE BF-103
A4003814.58
PX_BF-109
CRACKING FURNACE BF-109
A4002911.58
PX_BF-104
CRACKING FURNACE BF-104
A5,0372811.58
PX_BF-107
CRACKING FURNACE BF-107
A120239.01
PX_BF-111
CRACKING FURNACE BF-111
A1,500239.01
PX_BF-105-PD33
QO TO QUENCH FITTING
A12021.30
PX_BF-104-BRN03
DILUTION STEAM TO MIXED FEED COIL
A5,03700.45
PX_BF-105-DUCT29
COIL OUTLET BF-105
A12000.45

Lead time and procurement

Lead time 79 ± 50 days (PO history, 36 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
03 Sept 2026PR06
Regular replenishment
31,241Rp 192,46809 Oct 2026
open
36 d
25 Aug 2026PR06
Regular replenishment
39,621Rp 192,30811 Nov 2026
open
78 d
10 Aug 2026PR01
Import / long-lead
40,598Rp 182,76513 Dec 2026
open
125 d
31 Jul 2026PR06
Regular replenishment
30,209Rp 184,31315 Sept 202646 d
29 Jul 2026PR06
Regular replenishment
55,801Rp 195,04207 Sept 202640 d
16 Jun 2026PR05
Project / turnaround
59,634Rp 192,19324 Nov 2026
open
161 d
12 Jun 2026PR06
Regular replenishment
52,466Rp 189,04719 Aug 202668 d
04 Jun 2026PR05
Project / turnaround
37,855Rp 180,66304 Aug 202661 d
02 Jun 2026PR06
Regular replenishment
56,530Rp 182,76902 Aug 202661 d
30 May 2026PR06
Regular replenishment
41,935Rp 184,67108 Jul 202639 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107

Recent goods issues

Posting dateQtyOrderOrder type
22 Sept 202650201000039118Corrective
21 Sept 2026200201000022167Corrective
19 Sept 202650204000022416Preventive
11 Sept 202650204000013108Preventive
08 Sept 2026200201000035941Corrective
05 Sept 20265,700201000000202Corrective
03 Sept 202650201000031484Corrective
29 Aug 20261,500201000018854Corrective
27 Aug 2026200201000001746Corrective
25 Aug 2026600201000011526Corrective
24 Aug 202650201000000994Corrective
10 Aug 202650201000001248Corrective
10 Aug 20261,500204000007036Preventive
31 Jul 20261,500204000016683Preventive
27 Jul 2026200201000009720Corrective
Sparely