Sparely
DU

FIREBRICK,INSUL,23,76T,114W,230L

Material 4100071553 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071553
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (10 of 13 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
117 d · P80 163 d
Unit price
Rp 187,573

Recommendation

  • 1.Forecast 14,708 EA/year: 14,708 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~117 days; expected demand during lead time 4,703.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 12,242, order up to 13,468.
  • 4.Long lead time: 80% of deliveries took up to 163 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 13 FuncLoc(s), 10 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 8,650Single sourceAbnormal consumptionOpen POSame description as 8 other material numbers
On hand / on order
2,676 / 15,559
next delivery 02 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
12,242
safety stock 7,540
Rec. Max
13,468
order qty 1,226
Service level
99.5%
stockout risk now 0%
Unit price
Rp 187,573
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 14 issue days in the last 180 days, last issue 1 days ago, 101 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (9,150 units) excluded from the baseline.

Demand pattern Erratic · 49 issue days · 12 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 27.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 13 functional locations

10 with criticality A/B · 18,601 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1,50011442.86
PX_BF-106
CRACKING FURNACE BF-106
A4008230.86
PX_BF-102
CRACKING FURNACE BF-102
A1207128.72
PX_BF-103
CRACKING FURNACE BF-103
A4003814.58
PX_BF-109
CRACKING FURNACE BF-109
A4002911.58
PX_BF-104
CRACKING FURNACE BF-104
A5,0372811.58
PX_BF-111
CRACKING FURNACE BF-111
A400239.01
PX_BF-112-QF16
QO TO QUENCH FITTING
A5,03751.73
PX_BF-108-COIL32
CONVECTION SECTION
B5000.45
PX_BF-109-PD09
CONVECTION SECTION
B5000.45
PX_BF-110
CRACKING FURNACE BF-110
S504114.58
PX_BF-101
CRACKING FURNACE BF-101
S12083.02

Lead time and procurement

Lead time 117 ± 56 days (PO history, 15 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jul 2026PR03
Regular replenishment
9,625Rp 181,44516 Nov 2026
open
128 d
29 Jun 2026PR06
Regular replenishment
5,712Rp 187,57325 Sept 202688 d
20 Jun 2026PR03
Regular replenishment
9,959Rp 192,60629 Aug 202670 d
31 May 2026PR06
Regular replenishment
12,306Rp 186,87002 Sept 202694 d
10 Apr 2026PR06
Regular replenishment
6,932Rp 181,34419 Sept 2026162 d
09 Apr 2026PR03
Regular replenishment
5,934Rp 190,88502 Oct 2026
open
176 d
01 Apr 2026PR06
Regular replenishment
6,849Rp 190,01721 Aug 2026142 d
11 Mar 2026PR06
Regular replenishment
17,326Rp 187,96319 Jun 2026100 d
30 Dec 2025PR04
Regular (other)
11,011Rp 195,99711 May 2026132 d
23 Dec 2025PR03
Regular replenishment
15,317Rp 185,56407 Apr 2026105 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112-QF16Thermograph wall BF-112-QF16
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202650201000007314Corrective
30 Sept 202650201000024363Corrective
26 Sept 2026600201000025207Corrective
29 Aug 2026200201000004962Corrective
20 Aug 20261,500201000007325Corrective
28 Jul 20261,500201000017737Corrective
16 Jul 202650201000025691Corrective
08 Jul 2026200201000020343Corrective
08 Jul 2026200204000027608Preventive
06 Jul 2026200201000028383Corrective
18 Jun 2026200201000022104Corrective
11 Jun 202650201000006766Corrective
01 Jun 2026200201000032841Corrective
17 May 2026200201000001121Corrective
10 May 20265,700201000002115Corrective