Sparely
DU

FIREBRICK,INSUL,23,65T,114W,230L

Material 4100071591 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071591
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 11 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
91 d · P80 129 d
Unit price
Rp 50,487

Recommendation

  • 1.Forecast 7,944 EA/year: 7,944 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~91 days; expected demand during lead time 1,974.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6,461, order up to 7,998.
  • 4.Long lead time: 80% of deliveries took up to 129 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 11 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 2,950Single sourceAbnormal consumptionOpen POSame description as 8 other material numbers
On hand / on order
2,942 / 8,161
next delivery 01 Nov 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
6,461
safety stock 4,487
Rec. Max
7,998
order qty 1,537
Service level
99.9%
stockout risk now 0%
Unit price
Rp 50,487
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 47 days ago, 73 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4,450 units) excluded from the baseline.

Demand pattern Erratic · 40 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 19.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 11 functional locations

6 with criticality A/B · 20,701 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A1207128.72
PX_BF-103
CRACKING FURNACE BF-103
A1,5003814.58
PX_BF-109
CRACKING FURNACE BF-109
A4002911.58
PX_BF-104
CRACKING FURNACE BF-104
A4002811.58
PX_BF-107
CRACKING FURNACE BF-107
A120239.01
PX_BF-111
CRACKING FURNACE BF-111
A1,500239.01
PX_BF-104-DUCT34
CONVECTION SECTION
C5,03720.87
PX_BF-107-PD35
PEEP DOOR
C5,03700.45
PX_BF-110
CRACKING FURNACE BF-110
S5,0374114.58
PX_BF-108
CRACKING FURNACE BF-108
S50239.44
PX_BF-101
CRACKING FURNACE BF-101
S1,50083.02

Lead time and procurement

Lead time 91 ± 43 days (PO history, 11 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
01 Sept 2026PR06
Regular replenishment
8,161Rp 51,11701 Nov 2026
open
61 d
02 Aug 2026PR06
Regular replenishment
5,790Rp 50,48719 Sept 202648 d
12 Mar 2026PR03
Regular replenishment
9,821Rp 50,02312 May 202661 d
18 Jan 2026PR03
Regular replenishment
5,753Rp 50,94619 Mar 202660 d
02 Jan 2026PR06
Regular replenishment
10,886Rp 48,77012 Mar 202669 d
17 Nov 2025PR03
Regular replenishment
3,427Rp 48,00926 Mar 2026129 d
12 Nov 2025PR03
Regular replenishment
4,261Rp 50,93122 Apr 2026161 d
04 Aug 2025PR03
Regular replenishment
5,115Rp 50,77325 Nov 2025113 d
01 Jul 2025PR03
Regular replenishment
6,015Rp 50,59012 Dec 2025164 d
06 Jun 2025PR06
Regular replenishment
7,646Rp 49,09421 Aug 202576 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109

Recent goods issues

Posting dateQtyOrderOrder type
15 Aug 2026200204000039855Preventive
25 Jul 2026200201000034014Corrective
16 Jul 2026200201000016046Corrective
25 Jun 2026600201000031485Corrective
19 Jun 2026200209000016742Other maintenance
12 Jun 2026200201000016515Corrective
13 Apr 2026200201000010885Corrective
13 Apr 2026200201000021986Corrective
10 Mar 20261,500203000020244Turnaround
09 Mar 2026200201000023649Corrective
27 Feb 202650201000027080Corrective
24 Feb 20261,500201000005954Corrective
17 Feb 2026200201000002211Corrective
04 Feb 2026600201000000182Corrective
03 Feb 2026200201000019813Corrective