FIREBRICK,INSUL,28,76T,114W,230L

Material 4100071608 · FIREBRICK · Plant 1000

AReorderNormalBelow reorder point
Material
4100071608
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 9 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
58 d · P80 76 d
Unit price
Rp 145,828

Recommendation

  • 1.Forecast 8,476 EA/year: 8,476 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~58 days; expected demand during lead time 1,352.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5,006, order up to 5,940.
  • 4.On hand 2,660 + on order 0 is at or below the reorder point: order 3,280 now.
  • 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
3,280 EA
Rp 478.3M · order by 01 Oct 2026
Expected arrival ≈ 58 days
ML early warningLast turnaround used 900Single sourceAbnormal consumptionSame description as 7 other material numbers
On hand / on order
2,660 / 0
no open PO
Today Min / Max
1,325 / 3,344
static parameters in BoM
Rec. Min (reorder point)
5,006
safety stock 3,655
Rec. Max
5,940
order qty 934
Service level
99.9%
stockout risk now 13%
Unit price
Rp 145,828
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 10 issue days in the last 180 days, last issue 21 days ago, 71 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,400 units) excluded from the baseline.

Demand pattern Lumpy · 26 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 9 functional locations

6 with criticality A/B · 13,954 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A1208230.86
PX_BF-112
CRACKING FURNACE BF-112
A1,5007327.01
PX_BF-102
CRACKING FURNACE BF-102
A5,0377128.72
PX_BF-103
CRACKING FURNACE BF-103
A1203814.58
PX_BF-109
CRACKING FURNACE BF-109
A1,5002911.58
PX_BF-111-BRN10
BURNER BF-111
A12000.45
PX_BF-108
CRACKING FURNACE BF-108
S120239.44
PX_BF-108-DUCT20
BURNER BF-108
S5,03710.45
PX_BF-101-BRN18
QO TO QUENCH FITTING
S40000.45

Lead time and procurement

Lead time 58 ± 28 days (PO history, 15 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
08 Aug 2026PR03
Regular replenishment
4,707Rp 145,82819 Sept 202642 d
06 Jun 2026PR03
Regular replenishment
3,739Rp 147,36713 Jul 202637 d
15 May 2026PR03
Regular replenishment
4,896Rp 138,33706 Aug 202683 d
13 Feb 2026PR03
Regular replenishment
4,241Rp 149,92429 Mar 202644 d
23 Jan 2026PR03
Regular replenishment
5,692Rp 139,73603 Mar 202639 d
05 Jan 2026PR03
Regular replenishment
6,593Rp 141,51616 Feb 202642 d
29 Dec 2025PR03
Regular replenishment
2,506Rp 138,72103 Feb 202636 d
19 Dec 2025PR06
Regular replenishment
4,920Rp 145,92512 Feb 202655 d
17 Dec 2025PR03
Regular replenishment
9,037Rp 149,39709 Mar 202682 d
15 Oct 2025PR03
Regular replenishment
5,012Rp 146,63216 Nov 202532 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102

Recent goods issues

Posting dateQtyOrderOrder type
10 Sept 2026600201000001706Corrective
09 Sept 2026200201000030902Corrective
27 Aug 202650201000029977Corrective
10 Jul 202650209000029244Other maintenance
30 Jun 20261,500201000006875Corrective
24 Jun 202650201000038239Corrective
10 Jun 20261,500201000037853Corrective
21 May 2026200201000027299Corrective
16 May 2026200201000026522Corrective
22 Apr 202650201000039422Corrective
31 Jan 202650203000033471Turnaround
22 Jan 2026200201000014244Corrective
19 Jan 2026200201000037493Corrective
17 Jan 20261,500201000010430Corrective
16 Jan 202650201000023871Corrective