FIREBRICK,INSUL,26,65T,114W,230L

Material 4100071619 · FIREBRICK · Plant 1000

ALong-leadMaintainStockout
Material
4100071619
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 6 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
79 d · P80 101 d
Unit price
Rp 164,126

Recommendation

  • 1.Forecast 7,848 EA/year: 7,848 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~79 days; expected demand during lead time 1,690.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5,000, order up to 5,847.
  • 4.Long lead time: 80% of deliveries took up to 101 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 6 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 90% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 1,250Single sourceOpen POSame description as 9 other material numbers
On hand / on order
0 / 18,065
next delivery 13 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5,000
safety stock 3,310
Rec. Max
5,847
order qty 847
Service level
99.8%
stockout risk now 0%
Unit price
Rp 164,126
PO history
ML early warning: 90% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 128 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,750 units) excluded from the baseline.

Demand pattern Intermittent · 20 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 6 functional locations

5 with criticality A/B · 2,170 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A507327.01
PX_BF-111
CRACKING FURNACE BF-111
A120239.01
PX_BF-101-QF17
DILUTION STEAM TO MIXED FEED COIL
B1,50000.45
PX_BF-102-DUCT11
QO TO QUENCH FITTING
B5000.45
PX_BF-110-BRN23
QO TO QUENCH FITTING
B5000.45
PX_BF-108
CRACKING FURNACE BF-108
S400239.44

Lead time and procurement

Lead time 79 ± 38 days (PO history, 8 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Aug 2026PR05
Project / turnaround
5,304Rp 163,02803 Nov 2026
open
84 d
03 Jul 2026PR06
Regular replenishment
7,686Rp 169,50118 Oct 2026
open
107 d
28 May 2026PR04
Regular (other)
5,075Rp 167,93713 Oct 2026
open
138 d
19 May 2026PR06
Regular replenishment
1,994Rp 161,37130 Jul 202672 d
15 Mar 2026PR03
Regular replenishment
6,338Rp 166,52109 May 202655 d
28 Feb 2026PR06
Regular replenishment
7,574Rp 162,06924 Mar 202624 d
22 Sept 2025PR04
Regular (other)
4,026Rp 164,47724 Dec 202593 d
28 Jun 2025PR06
Regular replenishment
4,474Rp 163,77531 Aug 202564 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
07 Sept 2026MediumPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
26 May 2026600201000010656Corrective
17 May 2026600209000009186Other maintenance
03 Apr 2026600201000004104Corrective
15 Mar 2026200201000032248Corrective
08 Mar 202650201000016011Corrective
08 Mar 202650201000037555Corrective
24 Feb 202650201000027766Corrective
07 Feb 20261,500201000038712Corrective
21 Jan 2026200201000022157Corrective
04 Jan 20261,500201000021786Corrective
29 Dec 202550201000033768Corrective
28 Dec 2025200203000006078Turnaround
10 Dec 20251,500201000032472Corrective
08 Dec 2025600201000037522Corrective
03 Dec 2025600201000028898Corrective