FIREBRICK,INSUL,28,76T,114W,230L

Material 4100071673 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071673
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
MITRA ENERGI PERSADA PT
Lead time
117 d · P80 163 d
Unit price
Rp 49,288

Recommendation

  • 1.Forecast 6,686 EA/year: 6,686 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~117 days; expected demand during lead time 2,147.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6,947, order up to 8,374.
  • 4.Long lead time: 80% of deliveries took up to 163 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceAbnormal consumptionOpen POSame description as 7 other material numbers
On hand / on order
6,131 / 12,653
next delivery 03 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6,947
safety stock 4,801
Rec. Max
8,374
order qty 1,427
Service level
99.9%
stockout risk now 0%
Unit price
Rp 49,288
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 10 issue days in the last 180 days, last issue 24 days ago, 20 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 24 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 7 functional locations

4 with criticality A/B · 22,168 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A1,5002811.58
PX_BF-103-DUCT22
PEEP DOOR
B12031.30
PX_BF-105-COIL23
BURNER BF-105
B5,03700.45
PX_BF-112-COIL04
CONVECTION SECTION
B40000.45
PX_BF-101-QF04
PEEP DOOR
C5,03700.45
PX_BF-110
CRACKING FURNACE BF-110
S5,0374114.58
PX_BF-112-COIL21
BURNER BF-112
S5,03700.45

Lead time and procurement

Lead time 117 ± 54 days (PO history, 13 PO lines) · on-time 24%

PR dateTypeQtyUnit priceDeliveryLead time
21 May 2026PR03
Regular replenishment
2,598Rp 49,89003 Oct 2026
open
135 d
13 May 2026PR01
Import / long-lead
6,998Rp 49,97103 Oct 2026
open
143 d
23 Apr 2026PR06
Regular replenishment
6,992Rp 47,46326 Aug 2026125 d
15 Mar 2026PR03
Regular replenishment
3,057Rp 46,74417 Oct 2026
open
216 d
28 Feb 2026PR06
Regular replenishment
2,336Rp 47,23920 May 202681 d
12 Feb 2026PR04
Regular (other)
2,161Rp 49,28815 Sept 2026215 d
22 Nov 2025PR05
Project / turnaround
4,279Rp 47,80204 Mar 2026102 d
18 Jul 2025PR06
Regular replenishment
7,409Rp 49,30115 Dec 2025150 d
18 Jul 2025PR05
Project / turnaround
7,479Rp 49,46723 Nov 2025128 d
26 Jun 2025PR05
Project / turnaround
6,490Rp 49,29514 Dec 2025171 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
11 Sept 2026MediumPX_BF-110Leak from packing
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110

Recent goods issues

Posting dateQtyOrderOrder type
07 Sept 202650201000027042Corrective
07 Jul 2026200201000018451Corrective
07 Jul 2026600201000023095Corrective
27 Jun 2026600201000033111Corrective
20 Jun 2026600209000014083Other maintenance
17 Jun 2026600209000016742Other maintenance
16 Jun 2026200201000023778Corrective
02 Jun 2026200201000033522Corrective
28 May 2026200201000029008Corrective
30 Apr 20261,500201000011527Corrective
17 Apr 2026200201000014761Corrective
25 Feb 2026200201000005789Corrective
09 Feb 2026200201000033056Corrective
04 Feb 202650201000013194Corrective
29 Jan 20265,700201000017678Corrective