FIREBRICK,INSUL,23,65T,114W,230L

Material 4100071686 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071686
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
97 d · P80 134 d
Unit price
Rp 160,592

Recommendation

  • 1.Forecast 2,946 EA/year: 2,946 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~97 days; expected demand during lead time 784.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2,751, order up to 3,276.
  • 4.Long lead time: 80% of deliveries took up to 134 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 87% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 1,700Single sourceAbnormal consumptionOpen POSame description as 8 other material numbers
On hand / on order
2,516 / 2,875
next delivery 07 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
2,751
safety stock 1,968
Rec. Max
3,276
order qty 525
Service level
100.0%
stockout risk now 0%
Unit price
Rp 160,592
PO history
ML early warning: 87% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 15 days ago, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2,300 units) excluded from the baseline.

Demand pattern Lumpy · 14 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

2 with criticality A/B · 8,487 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A4002911.58
PX_BF-107
CRACKING FURNACE BF-107
A50239.01
PX_BF-110
CRACKING FURNACE BF-110
S1,5004114.58
PX_BF-108
CRACKING FURNACE BF-108
S1,500239.44
PX_BF-101
CRACKING FURNACE BF-101
S5,03783.02

Lead time and procurement

Lead time 97 ± 39 days (PO history, 7 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jun 2026PR03
Regular replenishment
1,379Rp 163,82607 Oct 2026
open
99 d
05 May 2026PR01
Import / long-lead
1,496Rp 154,86408 Oct 2026
open
156 d
21 Apr 2026PR06
Regular replenishment
1,542Rp 165,27112 Jun 202652 d
09 Apr 2026PR03
Regular replenishment
2,239Rp 155,66025 Jun 202677 d
15 Nov 2025PR03
Regular replenishment
1,049Rp 159,34709 Mar 2026114 d
08 Jul 2025PR03
Regular replenishment
1,554Rp 167,16224 Nov 2025139 d
27 Jun 2025PR03
Regular replenishment
2,837Rp 160,59211 Oct 2025106 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
11 Sept 2026MediumPX_BF-110Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
16 Sept 202650209000036917Other maintenance
23 Jul 2026600201000024568Corrective
30 Apr 2026600203000029810Turnaround
16 Mar 2026200201000018815Corrective
14 Feb 202650201000032808Corrective
20 Jan 202650201000025132Corrective
18 Jan 2026600201000018680Corrective
10 Dec 2025600201000037297Corrective
22 Nov 2025200203000038363Turnaround
20 Nov 20251,500203000038363Turnaround
24 Aug 202550201000039902Corrective
23 Aug 2025200201000039859Corrective
03 Aug 202550201000038329Corrective
18 Jul 2025600201000003403Corrective
12 Jul 20251,500209000011144Other maintenance