Sparely
DU

FIREBRICK,INSUL,23,76T,114W,230L

Material 4100071719 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071719
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI JAYA PT
Lead time
101 d · P80 151 d
Unit price
Rp 162,313

Recommendation

  • 1.Forecast 2,606 EA/year: 2,606 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~101 days; expected demand during lead time 720.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 2,037, order up to 2,528.
  • 4.Long lead time: 80% of deliveries took up to 151 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 93% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceAbnormal consumptionOpen POSame description as 8 other material numbers
On hand / on order
646 / 2,533
next delivery 19 Oct 2026
Today Min / Max
288 / 614
static parameters in BoM
Rec. Min (reorder point)
2,037
safety stock 1,318
Rec. Max
2,528
order qty 491
Service level
99.7%
stockout risk now 0%
Unit price
Rp 162,313
PO history
ML early warning: 93% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 1 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,500 units) excluded from the baseline.

Demand pattern Lumpy · 17 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

3 with criticality A/B · 2,470 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-104-COIL06
COIL OUTLET BF-104
A1,50000.45
PX_BF-112-COIL04
CONVECTION SECTION
B12000.45
PX_BF-103-BRN06
CONVECTION SECTION
C40000.45
PX_BF-111-COIL23
COIL OUTLET BF-111
C40000.45

Lead time and procurement

Lead time 101 ± 61 days (PO history, 9 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR03
Regular replenishment
2,533Rp 161,61419 Oct 2026
open
49 d
24 Feb 2026PR06
Regular replenishment
1,169Rp 159,02017 Jun 2026113 d
17 Dec 2025PR03
Regular replenishment
2,741Rp 160,95424 Jul 2026219 d
21 Oct 2025PR03
Regular replenishment
2,422Rp 162,31325 Nov 202535 d
16 Aug 2025PR06
Regular replenishment
1,668Rp 159,09012 Nov 202588 d
03 Aug 2025PR05
Project / turnaround
816Rp 168,08227 Feb 2026208 d
28 Jun 2025PR03
Regular replenishment
2,652Rp 171,79706 Oct 2025100 d
02 Jun 2025PR04
Regular (other)
1,649Rp 168,17918 Sept 2025108 d
24 May 2025PR03
Regular replenishment
1,967Rp 167,70425 Jul 202562 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
08 May 2026MediumPX_BF-111Repair refractory crack BF-111
20 Apr 2026EmergencyPX_BF-111Cleaning burner BF-111
16 Apr 2026MediumPX_BF-111Replace lamp as per PM finding
20 Mar 2026MediumPX_BF-111Painting BF-111
06 Mar 2026LowPX_BF-111Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 2026200201000028331Corrective
11 Aug 2026200204000007036Preventive
22 Jun 2026600201000001192Corrective
06 Jun 202650209000008419Other maintenance
11 Mar 202650201000029087Corrective
10 Mar 2026200201000015564Corrective
22 Jan 2026600201000001031Corrective
18 Dec 202550201000036582Corrective
25 Nov 2025200201000004694Corrective
21 Nov 202550201000025223Corrective
09 Oct 2025200201000015543Corrective
18 Sept 202550201000028860Corrective
31 Jul 2025600201000013503Corrective
31 Jul 20251,500203000033054Turnaround
25 Jul 20251,500201000004405Corrective