FIREBRICK,INSUL,28,76T,114W,230L

Material 4100071738 · FIREBRICK · Plant 1000

ALong-leadMonitorHealthy
Material
4100071738
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
MITRA ENERGI PERSADA PT
Lead time
92 d · P80 121 d
Unit price
Rp 176,016

Recommendation

  • 1.Forecast 4,427 EA/year: 4,427 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~92 days; expected demand during lead time 1,121.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 3,057, order up to 3,672.
  • 4.Long lead time: 80% of deliveries took up to 121 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 94% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemLast turnaround used 1,550Single sourceAbnormal consumptionOpen POSame description as 7 other material numbers
On hand / on order
418 / 2,931
next delivery 29 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3,057
safety stock 1,937
Rec. Max
3,672
order qty 615
Service level
99.5%
stockout risk now 0%
Unit price
Rp 176,016
PO history
ML early warning: 94% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 23 days ago, 29 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,750 units) excluded from the baseline.

Demand pattern Lumpy · 14 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

4 with criticality A/B · 5,727 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A503814.58
PX_BF-109
CRACKING FURNACE BF-109
A5,0372911.58
PX_BF-111
CRACKING FURNACE BF-111
A120239.01
PX_BF-101-QF17
DILUTION STEAM TO MIXED FEED COIL
B12000.45
PX_BF-108
CRACKING FURNACE BF-108
S400239.44

Lead time and procurement

Lead time 92 ± 74 days (PO history, 7 PO lines) · on-time 24%

PR dateTypeQtyUnit priceDeliveryLead time
23 Aug 2026PR06
Regular replenishment
2,931Rp 176,01629 Oct 2026
open
67 d
23 Feb 2026PR06
Regular replenishment
4,577Rp 169,23623 Apr 202659 d
13 Feb 2026PR06
Regular replenishment
4,301Rp 172,02206 May 202682 d
16 Nov 2025PR06
Regular replenishment
6,201Rp 181,55326 Dec 202540 d
10 Sept 2025PR01
Import / long-lead
5,334Rp 177,31516 Jun 2026279 d
17 Jul 2025PR06
Regular replenishment
4,188Rp 179,86925 Nov 2025131 d
07 May 2025PR06
Regular replenishment
4,981Rp 174,53914 Jun 202538 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103

Recent goods issues

Posting dateQtyOrderOrder type
08 Sept 2026600201000002044Corrective
11 Jul 20261,500201000029268Corrective
20 May 202650201000006538Corrective
09 Apr 20265,700201000025692Corrective
10 Feb 2026200201000014945Corrective
04 Feb 202650201000018202Corrective
20 Jan 202650203000029956Turnaround
22 Dec 2025200201000038215Corrective
18 Dec 20251,500203000014056Turnaround
31 Oct 2025200209000022917Other maintenance
11 Sept 202550201000024365Corrective
02 Sept 2025200201000001736Corrective
28 Aug 202550201000015857Corrective
25 Aug 2025200203000020904Turnaround
15 Aug 2025600201000006125Corrective