FIREBRICK,INSUL,23,65T,114W,230L

Material 4100071832 · FIREBRICK · Plant 1000

ALong-leadMonitorCritical insurance spare
Material
4100071832
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
KARYA SEJAHTERA NUSANTARA PT
Lead time
63 d · P80 131 d
Unit price
Rp 143,775

Recommendation

  • 1.Forecast 153 EA/year: 153 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~63 days; expected demand during lead time 26.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 396, order up to 792.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidateLong-leadSingle sourceSame description as 8 other material numbers
On hand / on order
1 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
396
safety stock 370
Rec. Max
792
order qty 396
Service level
99.8%
stockout risk now 6%
Unit price
Rp 143,775
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 302.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

2 with criticality A/B · 6,537 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A1,500239.01
PX_BF-101-COIL10
DILUTION STEAM TO MIXED FEED COIL
A5,03700.45

Lead time and procurement

Lead time 63 ± 47 days (PO history + category, 1 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jan 2026PR06
Regular replenishment
2Rp 143,77501 Feb 202625 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
08 May 2026MediumPX_BF-111Repair refractory crack BF-111
20 Apr 2026EmergencyPX_BF-111Cleaning burner BF-111
16 Apr 2026MediumPX_BF-111Replace lamp as per PM finding
20 Mar 2026MediumPX_BF-111Painting BF-111
06 Mar 2026LowPX_BF-111Install cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.