Sparely
DU

FIREBRICK,INSUL,26,65T,114W,230L

Material 4100071844 · FIREBRICK · Plant 1000

ALong-leadReorderCriticalCritical insurance spare
Material
4100071844
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
80 d · P80 131 d
Unit price
Rp 157,612

Recommendation

  • 1.Forecast 250 EA/year: 250 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~80 days; expected demand during lead time 55.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 396, order up to 792.
  • 4.On hand 4 + on order 2 is at or below the reorder point: order 786 now.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 8.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
786 EA
Rp 123.9M · order by 01 Oct 2026
Expected arrival ≈ 80 days
Long-leadML early warningSingle sourceOpen POSame description as 9 other material numbers
On hand / on order
4 / 2
next delivery 16 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
396
safety stock 341
Rec. Max
792
order qty 396
Service level
99.1%
stockout risk now 13%
Unit price
Rp 157,612
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 494.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

2 with criticality A/B · 1,900 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A1,5003814.58
PX_BF-112-COIL30
BURNER BF-112
A40020.87

Lead time and procurement

Lead time 80 ± 47 days (PO history + category, 2 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
04 Aug 2026PR04
Regular (other)
2Rp 163,83216 Dec 2026
open
134 d
02 Aug 2026PR06
Regular replenishment
2Rp 151,39211 Sept 202640 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Never issued in the 17-month history.

Sparely