FIREBRICK,INSUL,28,65T,114W,230L
Material 4100071868 · FIREBRICK · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100071868
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 76 d · P80 131 d
- Unit price
- Rp 157,612 (est.)
Recommendation
- 1.Forecast 340 EA/year: 340 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~76 days; expected demand during lead time 71.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 300, order up to 480.
- 4.On hand 14 + on order 0 is at or below the reorder point: order 466 now.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
466 EA
Rp 73.4M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
14 / 0
no open PO
Today Min / Max
11 / 16
static parameters in BoM
Rec. Min (reorder point)
300
safety stock 230
Rec. Max
480
order qty 180
Service level
99.9%
stockout risk now 76%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 346 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 5 functional locations
3 with criticality A/B · 5,657 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 50 | 28 | 11.58 |
| PX_BF-105-PD33 QO TO QUENCH FITTING | A | 120 | 2 | 1.30 |
| PX_BF-111-BRN10 BURNER BF-111 | A | 400 | 0 | 0.45 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 50 | 23 | 9.44 |
| PX_BF-109-PD08 COIL OUTLET BF-109 | S | 5,037 | 0 | 0.45 |
Lead time and procurement
Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 29 Aug 2026 | High | PX_BF-104 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Oct 2025 | 50 | 201000025942 | Corrective |