Sparely
DU

FIREBRICK,INSUL,28,65T,114W,230L

Material 4100071868 · FIREBRICK · Plant 1000

AReorderCriticalSlow-moving
Material
4100071868
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 340 EA/year: 340 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 71.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 300, order up to 480.
  • 4.On hand 14 + on order 0 is at or below the reorder point: order 466 now.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
466 EA
Rp 73.4M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
14 / 0
no open PO
Today Min / Max
11 / 16
static parameters in BoM
Rec. Min (reorder point)
300
safety stock 230
Rec. Max
480
order qty 180
Service level
99.9%
stockout risk now 76%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 346 days ago, 17 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

3 with criticality A/B · 5,657 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A502811.58
PX_BF-105-PD33
QO TO QUENCH FITTING
A12021.30
PX_BF-111-BRN10
BURNER BF-111
A40000.45
PX_BF-108
CRACKING FURNACE BF-108
S50239.44
PX_BF-109-PD08
COIL OUTLET BF-109
S5,03700.45

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
20 Oct 202550201000025942Corrective