FIREBRICK,INSUL,26,65T,114W,230L

Material 4100071925 · FIREBRICK · Plant 1000

AReorderCriticalStockout
Material
4100071925
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 9,337 EA/year: 9,337 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 1,944.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 6,300, order up to 7,350.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 7,350 now.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7,350 EA
Rp 1.2B · order by 01 Oct 2026
Expected arrival ≈ 76 days
Needs Management sign-off before it reaches the PR draft
Convert to Stock ItemPrice estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6,300
safety stock 4,356
Rec. Max
7,350
order qty 1,050
Service level
99.7%
stockout risk now 84%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 23% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 189 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

1 with criticality A/B · 1,550 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A507128.72
PX_BF-108
CRACKING FURNACE BF-108
S1,500239.44

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
07 Sept 2026MediumPX_BF-108Leak from packing
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102

Recent goods issues

Posting dateQtyOrderOrder type
26 Mar 2026600201000001401Corrective
19 Jan 20261,500201000014201Corrective