FIREBRICK,INSUL,23,76T,114W,230L
Material 4100071926 · FIREBRICK · Plant 1000
ATransferCriticalSlow-moving
- Material
- 4100071926
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 63 d · P80 63 d
- Unit price
- Rp 85,676
Recommendation
- 1.Forecast 2,913 EA/year: 2,913 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~63 days; expected demand during lead time 500.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2,000, order up to 2,715.
- 4.On hand 133 + on order 0 is at or below the reorder point: 2,582 needed.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.Identical part 4100073289, 4100072939 holds spare stock: transfer 2582 EA instead of buying — no purchase needed.
Single sourceSame description as 8 other material numbers
On hand / on order
133 / 0
no open PO
Today Min / Max
116 / 350
static parameters in BoM
Rec. Min (reorder point)
2,000
safety stock 1,500
Rec. Max
2,715
order qty 715
Service level
99.8%
stockout risk now 71%
Unit price
Rp 85,676
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 201 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 2 functional locations
1 with criticality A/B · 3,000 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1,500 | 82 | 30.86 |
| PX_BF-104-COIL31 BURNER BF-104 | C | 1,500 | 0 | 0.45 |
Lead time and procurement
Lead time 63 ± 29 days (PO history, 4 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Jul 2026 | PR06 Regular replenishment | 169 | Rp 82,944 | 27 Aug 2026 | 31 d |
| 28 Jun 2026 | PR03 Regular replenishment | 130 | Rp 84,240 | 30 Aug 2026 | 63 d |
| 01 Jan 2026 | PR06 Regular replenishment | 271 | Rp 87,111 | 24 Feb 2026 | 54 d |
| 17 Sept 2025 | PR03 Regular replenishment | 339 | Rp 89,797 | 19 Nov 2025 | 63 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
| 08 Sept 2026 | Medium | PX_BF-106 | Painting BF-106 |
| 03 Sept 2026 | Medium | PX_BF-106 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Mar 2026 | 600 | 201000007030 | Corrective |
| 09 Sept 2025 | 200 | 201000028451 | Corrective |