FIREBRICK,INSUL,23,76T,114W,230L

Material 4100071926 · FIREBRICK · Plant 1000

ATransferCriticalSlow-moving
Material
4100071926
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
63 d · P80 63 d
Unit price
Rp 85,676

Recommendation

  • 1.Forecast 2,913 EA/year: 2,913 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~63 days; expected demand during lead time 500.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2,000, order up to 2,715.
  • 4.On hand 133 + on order 0 is at or below the reorder point: 2,582 needed.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100073289, 4100072939 holds spare stock: transfer 2582 EA instead of buying — no purchase needed.
Single sourceSame description as 8 other material numbers
On hand / on order
133 / 0
no open PO
Today Min / Max
116 / 350
static parameters in BoM
Rec. Min (reorder point)
2,000
safety stock 1,500
Rec. Max
2,715
order qty 715
Service level
99.8%
stockout risk now 71%
Unit price
Rp 85,676
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 201 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

1 with criticality A/B · 3,000 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A1,5008230.86
PX_BF-104-COIL31
BURNER BF-104
C1,50000.45

Lead time and procurement

Lead time 63 ± 29 days (PO history, 4 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
27 Jul 2026PR06
Regular replenishment
169Rp 82,94427 Aug 202631 d
28 Jun 2026PR03
Regular replenishment
130Rp 84,24030 Aug 202663 d
01 Jan 2026PR06
Regular replenishment
271Rp 87,11124 Feb 202654 d
17 Sept 2025PR03
Regular replenishment
339Rp 89,79719 Nov 202563 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106
03 Sept 2026MediumPX_BF-106Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
14 Mar 2026600201000007030Corrective
09 Sept 2025200201000028451Corrective