FIREBRICK,INSUL,23,65T,114W,230L
Material 4100071952 · FIREBRICK · Plant 1000
AReorderCriticalStockout
- Material
- 4100071952
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 76 d · P80 131 d
- Unit price
- Rp 157,612 (est.)
Recommendation
- 1.Forecast 25,509 EA/year: 25,509 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~76 days; expected demand during lead time 5,311.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 14,800, order up to 17,267.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 17,267 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
17,267 EA
Rp 2.7B · order by 01 Oct 2026
Expected arrival ≈ 76 days
Needs Management sign-off before it reaches the PR draft
ML early warningConvert to Stock ItemPrice estimatedLead time estimatedSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
14,800
safety stock 9,489
Rec. Max
17,267
order qty 2,467
Service level
99.3%
stockout risk now 88%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 4 functional locations
3 with criticality A/B · 5,537 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 400 | 114 | 42.86 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 50 | 23 | 9.01 |
| PX_BF-101-DUCT24 PEEP DOOR | A | 5,037 | 0 | 0.45 |
| PX_BF-102-BRN24 QO TO QUENCH FITTING | C | 50 | 0 | 0.45 |
Lead time and procurement
Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
| 13 Sept 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 06 Sept 2026 | Medium | PX_BF-105 | Repair insulation BF-105 |
| 01 Sept 2026 | Low | PX_BF-105 | Peep door broken BF-105 |
| 30 Aug 2026 | Medium | PX_BF-105 | Painting BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Jul 2026 | 1,500 | 201000023707 | Corrective |
| 17 Nov 2025 | 200 | 201000036543 | Corrective |
| 16 Nov 2025 | 5,700 | 201000036543 | Corrective |