Sparely
DU

FIREBRICK,INSUL,23,65T,114W,230L

Material 4100071952 · FIREBRICK · Plant 1000

AReorderCriticalStockout
Material
4100071952
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 25,509 EA/year: 25,509 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 5,311.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 14,800, order up to 17,267.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 17,267 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
  • 6.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
17,267 EA
Rp 2.7B · order by 01 Oct 2026
Expected arrival ≈ 76 days
Needs Management sign-off before it reaches the PR draft
ML early warningConvert to Stock ItemPrice estimatedLead time estimatedSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
14,800
safety stock 9,489
Rec. Max
17,267
order qty 2,467
Service level
99.3%
stockout risk now 88%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 85 days ago, 25 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 4 functional locations

3 with criticality A/B · 5,537 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A40011442.86
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-101-DUCT24
PEEP DOOR
A5,03700.45
PX_BF-102-BRN24
QO TO QUENCH FITTING
C5000.45

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105

Recent goods issues

Posting dateQtyOrderOrder type
08 Jul 20261,500201000023707Corrective
17 Nov 2025200201000036543Corrective
16 Nov 20255,700201000036543Corrective