FIREBRICK,INSUL,26,65T,114W,230L

Material 4100072013 · FIREBRICK · Plant 1000

AMonitorInsurance gap
Material
4100072013
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 520 EA/year: 520 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~76 days; expected demand during lead time 108.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 791, order up to 1,187.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
791
safety stock 683
Rec. Max
1,187
order qty 396
Service level
99.7%
stockout risk now 24%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 3 functional locations

2 with criticality A/B · 5,137 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A507128.72
PX_BF-102-QF26
BURNER BF-102
A5,03700.45
PX_BF-101
CRACKING FURNACE BF-101
S5083.02

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102
27 Aug 2026MediumPX_BF-102Decoking follow up BF-102
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
14 Aug 2026EmergencyPX_BF-102Thermograph wall BF-102
12 Aug 2026HighPX_BF-102Peep door broken BF-102

Recent goods issues

Never issued in the 17-month history.