Sparely
DU

FIREBRICK,INSUL,28,65T,114W,230L

Material 4100072053 · FIREBRICK · Plant 1000

AReorderCriticalBelow reorder point
Material
4100072053
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 14,685 EA/year: 14,685 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 3,058.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 10,021, order up to 11,245.
  • 4.On hand 43 + on order 0 is at or below the reorder point: order 11,202 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
11,202 EA
Rp 1.8B · order by 01 Oct 2026
Expected arrival ≈ 76 days
Needs Management sign-off before it reaches the PR draft
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
43 / 0
no open PO
Today Min / Max
20 / 50
static parameters in BoM
Rec. Min (reorder point)
10,021
safety stock 6,964
Rec. Max
11,245
order qty 1,224
Service level
99.5%
stockout risk now 87%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 49 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 19.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 4 functional locations

3 with criticality A/B · 5,537 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A40011442.86
PX_BF-103
CRACKING FURNACE BF-103
A503814.58
PX_BF-109
CRACKING FURNACE BF-109
A502911.58
PX_BF-110
CRACKING FURNACE BF-110
S5,0374114.58

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026LowPX_BF-103Leak from packing
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 2026600201000029943Corrective