FIREBRICK,INSUL,26,65T,114W,230L

Material 4100072317 · FIREBRICK · Plant 1000

AReorderCriticalBelow reorder point
Material
4100072317
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 2,309 EA/year: 2,309 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 481.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,600, order up to 2,069.
  • 4.On hand 104 + on order 0 is at or below the reorder point: order 1,965 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100072687, 4100072072 holds spare stock: transfer 11 EA instead of buying, then buy the remaining 1954.
Proposed purchase requisition
1,954 EA
Rp 308.0M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
104 / 0
no open PO
Today Min / Max
19 / 46
static parameters in BoM
Rec. Min (reorder point)
1,600
safety stock 1,120
Rec. Max
2,069
order qty 469
Service level
99.9%
stockout risk now 91%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 22 days ago, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

2 with criticality A/B · 450 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A4007327.01
PX_BF-109
CRACKING FURNACE BF-109
A502911.58

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112

Recent goods issues

Posting dateQtyOrderOrder type
09 Sept 2026200201000017022Corrective