FIREBRICK,INSUL,26,65T,114W,230L
Material 4100072317 · FIREBRICK · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100072317
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 76 d · P80 131 d
- Unit price
- Rp 157,612 (est.)
Recommendation
- 1.Forecast 2,309 EA/year: 2,309 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~76 days; expected demand during lead time 481.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,600, order up to 2,069.
- 4.On hand 104 + on order 0 is at or below the reorder point: order 1,965 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100072687, 4100072072 holds spare stock: transfer 11 EA instead of buying, then buy the remaining 1954.
Proposed purchase requisition
1,954 EA
Rp 308.0M · order by 01 Oct 2026
Expected arrival ≈ 76 days
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
104 / 0
no open PO
Today Min / Max
19 / 46
static parameters in BoM
Rec. Min (reorder point)
1,600
safety stock 1,120
Rec. Max
2,069
order qty 469
Service level
99.9%
stockout risk now 91%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 22 days ago, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 2 functional locations
2 with criticality A/B · 450 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 400 | 73 | 27.01 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 50 | 29 | 11.58 |
Lead time and procurement
Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 01 Sept 2026 | Medium | PX_BF-112 | Replace burner tip BF-112 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Sept 2026 | 200 | 201000017022 | Corrective |