Material 4100072429 · FIREBRICK · Plant 1000

AMonitorCritical insurance spare
Material
4100072429
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 693 EA/year: 693 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~76 days; expected demand during lead time 144.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 791, order up to 1,187.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 8 other material numbers
On hand / on order
123 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
791
safety stock 647
Rec. Max
1,187
order qty 396
Service level
99.4%
stockout risk now 31%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 1 functional locations

1 with criticality A/B · 120 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A12011442.86

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Never issued in the 17-month history.