Material 4100072573 · FIREBRICK · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100072573
Category
FIREBRICK
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
96 d · P80 131 d
Unit price
Rp 55,883

Recommendation

  • 1.Forecast 749 EA/year: 749 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~96 days; expected demand during lead time 196.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,000, order up to 1,449.
  • 4.On hand 22 + on order 0 is at or below the reorder point: order 1,427 now.
  • 5.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 7.Identical part 4100073049 holds spare stock: transfer 342 EA instead of buying, then buy the remaining 1085.
Proposed purchase requisition
1,085 EA
Rp 60.6M · order by 01 Oct 2026
Expected arrival ≈ 96 days
Long-leadSingle sourceSame description as 7 other material numbers
On hand / on order
22 / 0
no open PO
Today Min / Max
11 / 27
static parameters in BoM
Rec. Min (reorder point)
1,000
safety stock 804
Rec. Max
1,449
order qty 449
Service level
99.9%
stockout risk now 62%
Unit price
Rp 55,883
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 61 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 1 functional locations

1 with criticality A/B · 1,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A1,5002911.58

Lead time and procurement

Lead time 96 ± 47 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
30 Oct 2025PR03
Regular replenishment
44Rp 55,88302 Apr 2026154 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
01 Aug 2026200201000008499Corrective