FIREBRICK,INSUL,28,76T,114W,230L
Material 4100072573 · FIREBRICK · Plant 1000
ALong-leadReorderCriticalBelow reorder point
- Material
- 4100072573
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- MEGA ENERGI ABADI PT
- Lead time
- 96 d · P80 131 d
- Unit price
- Rp 55,883
Recommendation
- 1.Forecast 749 EA/year: 749 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~96 days; expected demand during lead time 196.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,000, order up to 1,449.
- 4.On hand 22 + on order 0 is at or below the reorder point: order 1,427 now.
- 5.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
- 7.Identical part 4100073049 holds spare stock: transfer 342 EA instead of buying, then buy the remaining 1085.
Proposed purchase requisition
1,085 EA
Rp 60.6M · order by 01 Oct 2026
Expected arrival ≈ 96 days
Long-leadSingle sourceSame description as 7 other material numbers
On hand / on order
22 / 0
no open PO
Today Min / Max
11 / 27
static parameters in BoM
Rec. Min (reorder point)
1,000
safety stock 804
Rec. Max
1,449
order qty 449
Service level
99.9%
stockout risk now 62%
Unit price
Rp 55,883
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 61 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 1 functional locations
1 with criticality A/B · 1,500 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-109 CRACKING FURNACE BF-109 | A | 1,500 | 29 | 11.58 |
Lead time and procurement
Lead time 96 ± 47 days (PO history + category, 1 PO lines) · on-time 40%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Oct 2025 | PR03 Regular replenishment | 44 | Rp 55,883 | 02 Apr 2026 | 154 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 16 Aug 2026 | Medium | PX_BF-109 | Install cover plate BF-109 |
| 13 Jul 2026 | Medium | PX_BF-109 | Cleaning burner BF-109 |
| 09 Jul 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 09 Jul 2026 | Low | PX_BF-109 | Leak from packing |
| 01 Jul 2026 | Emergency | PX_BF-109 | [MSI-B-26-YDN-280/M] Replace line |
| 23 Jun 2026 | High | PX_BF-109 | Cleaning burner BF-109 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Aug 2026 | 200 | 201000008499 | Corrective |