FIREBRICK,INSUL,28,65T,114W,230L
Material 4100072624 · FIREBRICK · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100072624
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN JAYA PT
- Lead time
- 70 d · P80 131 d
- Unit price
- Rp 184,481
Recommendation
- 1.Forecast 137 EA/year: 137 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~70 days; expected demand during lead time 26.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 306.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 306 now.
- 5.Long lead time: 80% of deliveries took up to 131 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
306 EA
Rp 56.5M · order by 01 Oct 2026
Expected arrival ≈ 70 days
Long-leadSingle sourceSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
23 / 41
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 174
Rec. Max
306
order qty 106
Service level
100.0%
stockout risk now 41%
Unit price
Rp 184,481
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 324 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 1 functional locations
1 with criticality A/B · 400 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-111 CRACKING FURNACE BF-111 | A | 400 | 23 | 9.01 |
Lead time and procurement
Lead time 70 ± 47 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jan 2026 | PR03 Regular replenishment | 11 | Rp 182,027 | 19 Mar 2026 | 62 d |
| 10 Dec 2025 | PR03 Regular replenishment | 20 | Rp 186,934 | 08 Feb 2026 | 60 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
| 03 Aug 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 11 Jul 2026 | Medium | PX_BF-111 | Thermograph wall BF-111 |
| 27 Jun 2026 | Medium | PX_BF-111 | Leak from packing |
| 08 May 2026 | Medium | PX_BF-111 | Repair refractory crack BF-111 |
| 20 Apr 2026 | Emergency | PX_BF-111 | Cleaning burner BF-111 |
| 16 Apr 2026 | Medium | PX_BF-111 | Replace lamp as per PM finding |
| 20 Mar 2026 | Medium | PX_BF-111 | Painting BF-111 |
| 06 Mar 2026 | Low | PX_BF-111 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Nov 2025 | 50 | 201000025202 | Corrective |