FIREBRICK,INSUL,26,65T,114W,230L
Material 4100072687 · FIREBRICK · Plant 1000
SReducePotentially obsolete
- Material
- 4100072687
- Category
- FIREBRICK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 76 d · P80 131 d
- Unit price
- Rp 157,612 (est.)
Recommendation
- 1.Forecast 49 EA/year: 49 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~76 days; expected demand during lead time 10.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 9 exceeds the level to keep (0) by 9.
Convert to Non StockPrice estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 3%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 305,425/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~37 days.
Installed on 1 functional locations
0 with criticality A/B · 1,500 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-101 CRACKING FURNACE BF-101 | S | 1,500 | 8 | 3.02 |
Lead time and procurement
Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 16 Aug 2026 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 22 Jun 2026 | Low | PX_BF-101 | Thermograph wall BF-101 |
| 06 Jun 2026 | Emergency | PX_BF-101 | Decoking follow up BF-101 |
| 27 Nov 2025 | Medium | PX_BF-101 | Peep door broken BF-101 |
| 15 Oct 2025 | Medium | PX_BF-101 | Install scaffolding at BF-101 |
| 13 Aug 2025 | Emergency | PX_BF-101 | Leak from packing |
| 02 Jun 2025 | Low | PX_BF-101 | Install cover plate BF-101 |
Recent goods issues
Never issued in the 17-month history.