Sparely
DU

FIREBRICK,INSUL,23,76T,114W,230L

Material 4100072939 · FIREBRICK · Plant 1000

SReduceExcess
Material
4100072939
Category
FIREBRICK
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
76 d · P80 131 d
Unit price
Rp 157,612 (est.)

Recommendation

  • 1.Forecast 942 EA/year: 942 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 196.
  • 3.A 74.3% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 500.
  • 4.Stock 4,726 exceeds the level to keep (500) by 4,226.
Price estimatedLead time estimatedSame description as 8 other material numbers
On hand / on order
4,726 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 4
Rec. Max
500
order qty 300
Service level
74.3%
stockout risk now 0%
Unit price
Rp 157,612
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 5 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~37 days.

Installed on 1 functional locations

0 with criticality A/B · 1,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S1,5004114.58

Lead time and procurement

Lead time 76 ± 47 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Posting dateQtyOrderOrder type
26 Sept 2026200201000008900Corrective