Sparely
DU

CASTABLE,REFRACTORY,DENSE,1500DEG C

Material 4100073350 · CASTABLE · Plant 1000

AMonitorHealthy
Material
4100073350
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (9 of 18 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
51 d · P80 64 d
Unit price
Rp 49,802

Recommendation

  • 1.Forecast 37,522 KG/year: 37,522 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~51 days; expected demand during lead time 5,284.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 15,047, order up to 18,409.
  • 4.Installed on 18 FuncLoc(s), 9 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 15,950Single sourceAbnormal consumptionOpen POSame description as 2 other material numbers
On hand / on order
18,084 / 225,879
next delivery 06 Oct 2026
Today Min / Max
2,000 / 3,296
static parameters in BoM
Rec. Min (reorder point)
15,047
safety stock 9,764
Rec. Max
18,409
order qty 3,362
Service level
99.9%
stockout risk now 0%
Unit price
Rp 49,802
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 50 issue days in the last 180 days, last issue 1 days ago, 118 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 14 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (23,600 units) excluded from the baseline.

Demand pattern Erratic · 154 issue days · 44 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 68.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 18 functional locations

9 with criticality A/B · 12,500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A2511442.86
PX_BF-106
CRACKING FURNACE BF-106
A508230.86
PX_BF-112
CRACKING FURNACE BF-112
A5007327.01
PX_BF-102
CRACKING FURNACE BF-102
A5007128.72
PX_BF-103
CRACKING FURNACE BF-103
A5003814.58
PX_BF-109
CRACKING FURNACE BF-109
A252911.58
PX_BF-104
CRACKING FURNACE BF-104
A2002811.58
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-102-BRN12
CONVECTION SECTION
A3,00000.45
PX_BF-108-DUCT14
QO TO QUENCH FITTING
C5010.45
PX_BF-101-QF25
BURNER BF-101
C3,00000.45
PX_BF-102-PD10
COIL OUTLET BF-102
C20000.45

Lead time and procurement

Lead time 51 ± 23 days (PO history, 55 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
22 Sept 2026PR06
Regular replenishment
54,037Rp 52,10524 Nov 2026
open
63 d
05 Sept 2026PR06
Regular replenishment
45,386Rp 50,61227 Oct 2026
open
52 d
31 Aug 2026PR03
Regular replenishment
30,001Rp 48,78303 Dec 2026
open
94 d
12 Aug 2026PR03
Regular replenishment
27,721Rp 48,48507 Oct 2026
open
56 d
10 Aug 2026PR06
Regular replenishment
68,734Rp 51,66706 Oct 2026
open
57 d
07 Aug 2026PR06
Regular replenishment
31,268Rp 48,10415 Sept 202639 d
02 Aug 2026PR03
Regular replenishment
64,681Rp 49,09026 Sept 202655 d
01 Jul 2026PR03
Regular replenishment
72,049Rp 49,31315 Sept 202676 d
11 Jun 2026PR03
Regular replenishment
71,044Rp 51,31827 Jul 202646 d
01 Jun 2026PR03
Regular replenishment
30,882Rp 51,97126 Jun 202625 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20265,000201000006629Corrective
30 Sept 20261,000201000024007Corrective
29 Sept 20261,000201000024559Corrective
27 Sept 2026200209000029477Other maintenance
26 Sept 202650201000014873Corrective
26 Sept 20261,000201000028026Corrective
23 Sept 202650201000009714Corrective
22 Sept 202650201000035332Corrective
15 Sept 202625201000001079Corrective
08 Sept 2026200204000028728Preventive
07 Sept 20265,000201000022798Corrective
05 Sept 202650201000030840Corrective
04 Sept 20261,000201000009201Corrective
03 Sept 202625201000030139Corrective
01 Sept 202650201000023287Corrective