Sparely
DU

CASTABLE,REFRACTORY,DENSE,1600DEG C

Material 4100073384 · CASTABLE · Plant 1000

AMonitorHealthy
Material
4100073384
Category
CASTABLE
Base unit
KG
MRP type
Non Stock
Criticality
A (10 of 15 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
71 d · P80 87 d
Unit price
Rp 45,004

Recommendation

  • 1.Forecast 5,370 KG/year: 5,370 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~71 days; expected demand during lead time 1,040.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,833, order up to 4,171.
  • 4.Installed on 15 FuncLoc(s), 10 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningConvert to Stock ItemLast turnaround used 6,375Single sourceAbnormal consumptionOpen POSame description as 2 other material numbers
On hand / on order
2,877 / 63,464
next delivery 11 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2,833
safety stock 1,793
Rec. Max
4,171
order qty 1,338
Service level
99.9%
stockout risk now 0%
Unit price
Rp 45,004
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 30 issue days in the last 180 days, last issue 1 days ago, 117 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 13 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (7,550 units) excluded from the baseline.

Demand pattern Erratic · 81 issue days · 29 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 38.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 15 functional locations

10 with criticality A/B · 14,125 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A50011442.86
PX_BF-106
CRACKING FURNACE BF-106
A3,0008230.86
PX_BF-112
CRACKING FURNACE BF-112
A3,0007327.01
PX_BF-102
CRACKING FURNACE BF-102
A2007128.72
PX_BF-103
CRACKING FURNACE BF-103
A5003814.58
PX_BF-109
CRACKING FURNACE BF-109
A3,0002911.58
PX_BF-104
CRACKING FURNACE BF-104
A1,2002811.58
PX_BF-111
CRACKING FURNACE BF-111
A50239.01
PX_BF-108-BRN33
CONVECTION SECTION
A1,20000.45
PX_BF-105-COIL23
BURNER BF-105
B5000.45
PX_BF-110
CRACKING FURNACE BF-110
S2004114.58
PX_BF-108
CRACKING FURNACE BF-108
S200239.44

Lead time and procurement

Lead time 71 ± 30 days (PO history, 26 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
13 Sept 2026PR06
Regular replenishment
20,916Rp 44,29209 Nov 2026
open
57 d
01 Sept 2026PR05
Project / turnaround
10,224Rp 43,39814 Nov 2026
open
74 d
23 Aug 2026PR06
Regular replenishment
22,806Rp 46,79030 Oct 2026
open
68 d
08 Aug 2026PR05
Project / turnaround
9,518Rp 43,99311 Oct 2026
open
64 d
20 Jul 2026PR06
Regular replenishment
16,763Rp 45,52110 Sept 202652 d
18 May 2026PR06
Regular replenishment
25,220Rp 45,09904 Aug 202678 d
16 May 2026PR06
Regular replenishment
12,587Rp 45,87713 Jul 202658 d
14 May 2026PR03
Regular replenishment
30,893Rp 43,39912 Jul 202659 d
08 May 2026PR06
Regular replenishment
8,452Rp 43,91902 Jul 202655 d
01 May 2026PR04
Regular (other)
11,848Rp 46,82227 Jul 202687 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202625201000025027Corrective
23 Sept 20261,000201000004407Corrective
19 Sept 202625201000011812Corrective
09 Sept 20265,000201000034333Corrective
02 Sept 202625201000001231Corrective
30 Aug 2026200201000013852Corrective
28 Aug 20265,000201000007716Corrective
25 Aug 202625201000024850Corrective
12 Aug 20261,000201000025404Corrective
11 Aug 2026200201000021114Corrective
01 Aug 202650201000026506Corrective
31 Jul 2026200201000003587Corrective
27 Jul 20261,000201000030925Corrective
25 Jul 202625204000026843Preventive
16 Jul 202650201000025691Corrective
Sparely