Sparely
DU

CASTABLE,REFRACTORY,INSUL,1600DEG C

Material 4100073394 · CASTABLE · Plant 1000

ALong-leadMonitorStockout
Material
4100073394
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
PRIMA TEKNOLOGI PERSADA PT
Lead time
80 d · P80 114 d
Unit price
Rp 66,771

Recommendation

  • 1.Forecast 5,741 KG/year: 5,741 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~80 days; expected demand during lead time 1,252.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,225, order up to 5,361.
  • 4.Long lead time: 80% of deliveries took up to 114 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 1,400Single sourceAbnormal consumptionOpen POSame description as 3 other material numbers
On hand / on order
0 / 121,960
next delivery 03 Oct 2026
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
4,225
safety stock 2,973
Rec. Max
5,361
order qty 1,136
Service level
99.9%
stockout risk now 0%
Unit price
Rp 66,771
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 16 issue days in the last 180 days, last issue 1 days ago, 37 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 9 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,425 units) excluded from the baseline.

Demand pattern Erratic · 59 issue days · 13 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 25.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 4 functional locations

2 with criticality A/B · 625 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A258230.86
PX_BF-109
CRACKING FURNACE BF-109
A502911.58
PX_BF-110
CRACKING FURNACE BF-110
S504114.58
PX_BF-112-COIL21
BURNER BF-112
S50000.45

Lead time and procurement

Lead time 80 ± 50 days (PO history, 22 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
16 Sept 2026PR06
Regular replenishment
29,539Rp 65,76002 Nov 2026
open
47 d
19 Aug 2026PR03
Regular replenishment
18,123Rp 65,57918 Oct 2026
open
60 d
18 Aug 2026PR06
Regular replenishment
16,009Rp 65,59026 Sept 202639 d
14 Aug 2026PR03
Regular replenishment
11,628Rp 66,88022 Nov 2026
open
100 d
12 Aug 2026PR05
Project / turnaround
19,430Rp 67,07426 Dec 2026
open
136 d
04 Jul 2026PR05
Project / turnaround
28,158Rp 66,43024 Mar 2027
open
263 d
22 May 2026PR01
Import / long-lead
24,509Rp 64,86217 Sept 2026118 d
09 May 2026PR03
Regular replenishment
25,202Rp 69,77818 Jul 202670 d
02 May 2026PR03
Regular replenishment
15,082Rp 65,50503 Oct 2026
open
154 d
18 Mar 2026PR03
Regular replenishment
29,772Rp 66,78212 Jun 202686 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026LowPX_BF-106Peep door broken BF-106

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261,000201000025027Corrective
26 Sept 2026200201000005210Corrective
22 Sept 2026200201000011818Corrective
21 Sept 202650201000019618Corrective
08 Sept 2026200201000030902Corrective
22 Aug 202625201000023798Corrective
12 Aug 2026200201000031702Corrective
16 Jul 202625201000038493Corrective
04 Jul 2026200201000027956Corrective
03 Jul 202650201000029448Corrective
28 Jun 202625201000036525Corrective
20 Jun 202650201000017155Corrective
15 Jun 20265,000201000024527Corrective
12 Jun 202650201000023683Corrective
17 Apr 202650201000006270Corrective