CASTABLE,REFRACTORY,INSUL,1500DEG C
Material 4100073441 · CASTABLE · Plant 1000
AMonitorHealthy
- Material
- 4100073441
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 64 d · P80 85 d
- Unit price
- Rp 42,675
Recommendation
- 1.Forecast 6,757 KG/year: 6,757 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~64 days; expected demand during lead time 1,183.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4,590, order up to 6,132.
- 4.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 400Single sourceAbnormal consumptionOpen POSame description as 4 other material numbers
On hand / on order
4,943 / 20,951
next delivery 11 Oct 2026
Today Min / Max
2,000 / 3,110
static parameters in BoM
Rec. Min (reorder point)
4,590
safety stock 3,408
Rec. Max
6,132
order qty 1,542
Service level
99.9%
stockout risk now 0%
Unit price
Rp 42,675
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 11 issue days in the last 180 days, last issue 5 days ago, 38 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1,450 units) excluded from the baseline.
Demand pattern Erratic · 33 issue days · 7 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 15.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 4 functional locations
3 with criticality A/B · 7,400 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1,200 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 3,000 | 38 | 14.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 3,000 | 28 | 11.58 |
| PX_BF-101 CRACKING FURNACE BF-101 | S | 200 | 8 | 3.02 |
Lead time and procurement
Lead time 64 ± 31 days (PO history, 11 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR05 Project / turnaround | 9,228 | Rp 41,294 | 05 Jan 2027 open | 115 d |
| 04 Sept 2026 | PR06 Regular replenishment | 6,575 | Rp 43,502 | 25 Oct 2026 open | 51 d |
| 20 Jul 2026 | PR03 Regular replenishment | 2,866 | Rp 43,431 | 24 Aug 2026 | 35 d |
| 18 Jul 2026 | PR03 Regular replenishment | 5,148 | Rp 42,163 | 11 Oct 2026 open | 85 d |
| 28 May 2026 | PR01 Import / long-lead | 4,119 | Rp 43,893 | 17 Jul 2026 | 50 d |
| 09 Apr 2026 | PR03 Regular replenishment | 5,011 | Rp 41,225 | 22 May 2026 | 43 d |
| 11 Mar 2026 | PR03 Regular replenishment | 6,322 | Rp 42,908 | 12 Jul 2026 | 123 d |
| 16 Oct 2025 | PR06 Regular replenishment | 4,117 | Rp 40,704 | 10 Nov 2025 | 25 d |
| 19 Aug 2025 | PR03 Regular replenishment | 5,748 | Rp 42,675 | 18 Oct 2025 | 60 d |
| 25 Jun 2025 | PR03 Regular replenishment | 5,784 | Rp 40,921 | 09 Sept 2025 | 76 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 14 Sept 2026 | Medium | PX_BF-101 | Replace lamp as per PM finding |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 25 | 201000033332 | Corrective |
| 18 Sept 2026 | 25 | 201000017824 | Corrective |
| 10 Sept 2026 | 50 | 201000020312 | Corrective |
| 07 Sept 2026 | 200 | 201000021947 | Corrective |
| 28 Aug 2026 | 25 | 201000016379 | Corrective |
| 01 Aug 2026 | 200 | 201000026506 | Corrective |
| 27 Jul 2026 | 5,000 | 201000031994 | Corrective |
| 25 Jul 2026 | 5,000 | 201000014397 | Corrective |
| 19 Jun 2026 | 25 | 201000019956 | Corrective |
| 02 Jun 2026 | 1,000 | 201000022564 | Corrective |
| 15 May 2026 | 200 | 201000002968 | Corrective |
| 23 Feb 2026 | 1,000 | 201000015990 | Corrective |
| 21 Feb 2026 | 25 | 201000031649 | Corrective |
| 08 Jan 2026 | 25 | 201000012817 | Corrective |
| 31 Dec 2025 | 200 | 201000017002 | Corrective |