CASTABLE,REFRACTORY,DENSE,1700DEG C
Material 4100073531 · CASTABLE · Plant 1000
ALong-leadReduceExcess
- Material
- 4100073531
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 124 d · P80 180 d
- Unit price
- Rp 36,515
Recommendation
- 1.Forecast 1,297 KG/year: 1,297 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~124 days; expected demand during lead time 442.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,326, order up to 2,057.
- 4.Stock 5,752 exceeds the level to keep (2,057) by 3,695.
- 5.Long lead time: 80% of deliveries took up to 180 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
- 7.ML early warning: 95% probability of demand in the next 90 days.
Long-leadML early warningLast turnaround used 25Single sourceAbnormal consumptionOpen POSame description as 2 other material numbers
On hand / on order
5,752 / 20,963
next delivery 29 Oct 2026
Today Min / Max
1,065 / 2,326
static parameters in BoM
Rec. Min (reorder point)
1,326
safety stock 884
Rec. Max
2,057
order qty 731
Service level
99.9%
stockout risk now 0%
Unit price
Rp 36,515
PO history
ML early warning: 95% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 1 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (5,150 units) excluded from the baseline.
Demand pattern Erratic · 20 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 8.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 3 functional locations
3 with criticality A/B · 75 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-112 CRACKING FURNACE BF-112 | A | 25 | 73 | 27.01 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 25 | 38 | 14.58 |
| PX_BF-104-COIL06 COIL OUTLET BF-104 | A | 25 | 0 | 0.45 |
Lead time and procurement
Lead time 124 ± 37 days (PO history, 5 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Sept 2026 | PR05 Project / turnaround | 4,540 | Rp 36,023 | 30 Apr 2027 open | 238 d |
| 18 Aug 2026 | PR06 Regular replenishment | 3,582 | Rp 37,053 | 12 Jan 2027 open | 147 d |
| 16 Jun 2026 | PR03 Regular replenishment | 6,901 | Rp 34,961 | 29 Oct 2026 open | 135 d |
| 16 May 2026 | PR06 Regular replenishment | 3,022 | Rp 36,096 | 28 Sept 2026 | 135 d |
| 25 Feb 2026 | PR05 Project / turnaround | 5,940 | Rp 36,933 | 02 Mar 2027 open | 370 d |
| 17 Jul 2025 | PR06 Regular replenishment | 6,555 | Rp 37,137 | 30 Dec 2025 | 166 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 17 Sept 2026 | Medium | PX_BF-112 | Cleaning burner BF-112 |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 04 Sept 2026 | High | PX_BF-112 | Install scaffolding at BF-112 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 25 | 201000024363 | Corrective |
| 08 Sept 2026 | 25 | 201000030378 | Corrective |
| 18 Jul 2026 | 200 | 201000014538 | Corrective |
| 30 Jun 2026 | 25 | 201000015458 | Corrective |
| 14 Apr 2026 | 50 | 201000012829 | Corrective |
| 05 Feb 2026 | 50 | 203000032991 | Turnaround |
| 03 Feb 2026 | 25 | 201000010732 | Corrective |
| 13 Jan 2026 | 25 | 201000004976 | Corrective |
| 13 Jan 2026 | 200 | 201000031182 | Corrective |
| 08 Jan 2026 | 200 | 201000017662 | Corrective |
| 01 Jan 2026 | 50 | 201000023226 | Corrective |
| 20 Dec 2025 | 50 | 201000025786 | Corrective |
| 04 Dec 2025 | 25 | 203000037280 | Turnaround |
| 26 Nov 2025 | 1,000 | 201000005744 | Corrective |
| 25 Nov 2025 | 50 | 201000014700 | Corrective |