CASTABLE,REFRACTORY,LW,1700DEG C

Material 4100073545 · CASTABLE · Plant 1000

AReduceExcess
Material
4100073545
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI JAYA PT
Lead time
48 d · P80 56 d
Unit price
Rp 34,898

Recommendation

  • 1.Forecast 687 KG/year: 687 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~48 days; expected demand during lead time 90.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 484, order up to 1,028.
  • 4.Stock 7,683 exceeds the level to keep (1,028) by 6,655.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.ML early warning: 80% probability of demand in the next 90 days.
ML early warningLast turnaround used 125Single sourceAbnormal consumptionSame description as 6 other material numbers
On hand / on order
7,683 / 0
no open PO
Today Min / Max
2,000 / 3,344
static parameters in BoM
Rec. Min (reorder point)
484
safety stock 395
Rec. Max
1,028
order qty 544
Service level
100.0%
stockout risk now 0%
Unit price
Rp 34,898
PO history
ML early warning: 80% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 25 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (125 units) excluded from the baseline.

Demand pattern Lumpy · 14 issue days · 6 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A252811.58

Lead time and procurement

Lead time 48 ± 19 days (PO history, 7 PO lines) · on-time 45%

PR dateTypeQtyUnit priceDeliveryLead time
12 Aug 2026PR03
Regular replenishment
12,874Rp 34,89804 Sept 202623 d
15 Apr 2026PR03
Regular replenishment
14,201Rp 33,97431 May 202646 d
09 Jan 2026PR03
Regular replenishment
14,318Rp 36,41818 Feb 202640 d
21 Dec 2025PR03
Regular replenishment
5,881Rp 34,87926 Feb 202667 d
05 Sept 2025PR03
Regular replenishment
12,091Rp 35,92418 Oct 202543 d
01 Jul 2025PR03
Regular replenishment
9,166Rp 34,26027 Jul 202526 d
25 May 2025PR03
Regular replenishment
9,915Rp 36,62522 Jul 202558 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing
08 Aug 2026LowPX_BF-104[MSI-B-26-MZB-191] Permanent repair
04 Aug 2026MediumPX_BF-104Thermograph wall BF-104
04 Aug 2026MediumPX_BF-104Peep door broken BF-104
21 Jul 2026MediumPX_BF-104Hot spot at convection BF-104

Recent goods issues

Posting dateQtyOrderOrder type
06 Sept 202650201000007893Corrective
20 May 20265,000201000027299Corrective
18 Jan 20261,000201000019053Corrective
13 Jan 202625206000020289Other maintenance
12 Jan 2026200201000032767Corrective
13 Dec 202525201000021748Corrective
07 Dec 202525201000034802Corrective
24 Nov 202525203000032713Turnaround
12 Nov 202550203000023445Turnaround
10 Nov 202550203000039046Turnaround
30 Aug 202525209000035104Other maintenance
11 Aug 202523,135201000009159Corrective
02 Aug 202525209000000237Other maintenance
18 Jul 202550201000019985Corrective
10 Jul 2025200209000000281Other maintenance