CASTABLE,REFRACTORY,LW,1300DEG C
Material 4100073634 · CASTABLE · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100073634
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Non Stock
- Criticality
- A (5 of 7 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN JAYA PT
- Lead time
- 68 d · P80 92 d
- Unit price
- Rp 82,456
Recommendation
- 1.Forecast 790 KG/year: 790 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~68 days; expected demand during lead time 148.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 493, order up to 873.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 873 now.
- 5.Long lead time: 80% of deliveries took up to 92 days and the fastest seen in its category 30 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 7 FuncLoc(s), 5 of them criticality A/B.
- 7.ML early warning: 97% probability of demand in the next 90 days.
- 8.Identical part 4100074336 holds spare stock: transfer 52 KG instead of buying, then buy the remaining 821.
Proposed purchase requisition
821 KG
Rp 67.7M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Long-leadML early warningConvert to Stock ItemLast turnaround used 125Single sourceAbnormal consumptionSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
493
safety stock 346
Rec. Max
873
order qty 380
Service level
99.9%
stockout risk now 91%
Unit price
Rp 82,456
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 21 days ago, 69 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (125 units) excluded from the baseline.
Demand pattern Lumpy · 10 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 10.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 7 functional locations
5 with criticality A/B · 7,300 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 50 | 114 | 42.86 |
| PX_BF-106 CRACKING FURNACE BF-106 | A | 3,000 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 500 | 73 | 27.01 |
| PX_BF-109 CRACKING FURNACE BF-109 | A | 50 | 29 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 500 | 23 | 9.01 |
| PX_BF-105-PD18 PEEP DOOR | C | 3,000 | 0 | 0.45 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 200 | 23 | 9.44 |
Lead time and procurement
Lead time 68 ± 27 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Jun 2026 | PR05 Project / turnaround | 212 | Rp 82,456 | 09 Sept 2026 | 99 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Sept 2026 | 50 | 201000017022 | Corrective |
| 31 Jul 2026 | 50 | 201000028458 | Corrective |
| 04 Jul 2026 | 50 | 201000014145 | Corrective |
| 25 Jun 2026 | 25 | 201000031485 | Corrective |
| 03 May 2026 | 50 | 201000020678 | Corrective |
| 15 Apr 2026 | 200 | 201000012733 | Corrective |
| 18 Mar 2026 | 25 | 201000022030 | Corrective |
| 31 Jan 2026 | 25 | 201000032440 | Corrective |
| 24 Jan 2026 | 50 | 201000008007 | Corrective |
| 09 Nov 2025 | 50 | 203000029164 | Turnaround |
| 07 Nov 2025 | 25 | 203000039046 | Turnaround |
| 05 Nov 2025 | 50 | 203000004034 | Turnaround |
| 30 Jun 2025 | 25 | 209000008119 | Other maintenance |