CASTABLE,REFRACTORY,INSUL,1500DEG C
Material 4100073702 · CASTABLE · Plant 1000
ATransferCriticalStockout
- Material
- 4100073702
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Non Stock
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 58 d · P80 92 d
- Unit price
- Rp 43,840 (est.)
Recommendation
- 1.Forecast 565 KG/year: 565 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~58 days; expected demand during lead time 90.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 335, order up to 775.
- 4.On hand 0 + on order 0 is at or below the reorder point: 775 needed.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
- 6.Identical part 4100073754, 4100073441, 4100073873 holds spare stock: transfer 775 KG instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
335
safety stock 246
Rec. Max
775
order qty 440
Service level
99.9%
stockout risk now 87%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 383 days ago, 47 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 5 functional locations
4 with criticality A/B · 2,725 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1,200 | 82 | 30.86 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 500 | 71 | 28.72 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 500 | 23 | 9.01 |
| PX_BF-110-COIL27 QO TO QUENCH FITTING | A | 25 | 0 | 0.45 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 500 | 23 | 9.44 |
Lead time and procurement
Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Sept 2025 | 25 | 201000012551 | Corrective |