CASTABLE,REFRACTORY,INSUL,1500DEG C

Material 4100073702 · CASTABLE · Plant 1000

ATransferCriticalStockout
Material
4100073702
Category
CASTABLE
Base unit
KG
MRP type
Non Stock
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 565 KG/year: 565 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 90.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 335, order up to 775.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 775 needed.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
  • 6.Identical part 4100073754, 4100073441, 4100073873 holds spare stock: transfer 775 KG instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
335
safety stock 246
Rec. Max
775
order qty 440
Service level
99.9%
stockout risk now 87%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 383 days ago, 47 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 5 functional locations

4 with criticality A/B · 2,725 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A1,2008230.86
PX_BF-102
CRACKING FURNACE BF-102
A5007128.72
PX_BF-111
CRACKING FURNACE BF-111
A500239.01
PX_BF-110-COIL27
QO TO QUENCH FITTING
A2500.45
PX_BF-108
CRACKING FURNACE BF-108
S500239.44

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106

Recent goods issues

Posting dateQtyOrderOrder type
13 Sept 202525201000012551Corrective