CASTABLE,REFRACTORY,INSUL,1600DEG C
Material 4100073733 · CASTABLE · Plant 1000
AReduceSlow-moving
- Material
- 4100073733
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 58 d · P80 92 d
- Unit price
- Rp 43,840 (est.)
Recommendation
- 1.Forecast 212 KG/year: 212 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~58 days; expected demand during lead time 34.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 272, order up to 485.
- 4.Stock 1,483 exceeds the level to keep (485) by 998.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
1,483 / 0
no open PO
Today Min / Max
661 / 1,101
static parameters in BoM
Rec. Min (reorder point)
272
safety stock 239
Rec. Max
485
order qty 213
Service level
99.9%
stockout risk now 0%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 31 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1,000 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.
Installed on 2 functional locations
1 with criticality A/B · 3,025 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-105 CRACKING FURNACE BF-105 | A | 3,000 | 114 | 42.86 |
| PX_BF-110 CRACKING FURNACE BF-110 | S | 25 | 41 | 14.58 |
Lead time and procurement
Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | High | PX_BF-105 | Repair refractory crack BF-105 |
| 21 Sept 2026 | Medium | PX_BF-110 | Replace burner tip BF-110 |
| 20 Sept 2026 | Medium | PX_BF-105 | Replace lamp as per PM finding |
| 20 Sept 2026 | Medium | PX_BF-105 | Install scaffolding at BF-105 |
| 17 Sept 2026 | Medium | PX_BF-110 | Install scaffolding at BF-110 |
| 15 Sept 2026 | Medium | PX_BF-110 | Decoking follow up BF-110 |
| 14 Sept 2026 | Low | PX_BF-105 | Install cover plate BF-105 |
| 13 Sept 2026 | Medium | PX_BF-105 | Thermograph wall BF-105 |
| 11 Sept 2026 | Medium | PX_BF-110 | Leak from packing |
| 06 Sept 2026 | Medium | PX_BF-105 | Repair insulation BF-105 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jun 2025 | 1,000 | 203000034428 | Turnaround |