CASTABLE,REFRACTORY,INSUL,1500DEG C

Material 4100073754 · CASTABLE · Plant 1000

SMonitorSlow-moving
Material
4100073754
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
S (0 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 100 KG/year: 100 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 16.
  • 3.A 83.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 100.
Price estimatedLead time estimatedSame description as 4 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
100
order qty 100
Service level
83.9%
stockout risk now 16%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 18 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (25 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~30 days.

Installed on 3 functional locations

0 with criticality A/B · 1,275 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S1,2004114.58
PX_BF-108
CRACKING FURNACE BF-108
S25239.44
PX_BF-101
CRACKING FURNACE BF-101
S5083.02

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-110Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110

Recent goods issues

Posting dateQtyOrderOrder type
26 Jun 202525203000034428Turnaround