CASTABLE,REFRACTORY,DENSE,1300DEG C
Material 4100073773 · CASTABLE · Plant 1000
CReduceSlow-moving
- Material
- 4100073773
- Category
- CASTABLE
- Base unit
- KG
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA LOGAM PRATAMA PT
- Lead time
- 60 d · P80 92 d
- Unit price
- Rp 39,386
Recommendation
- 1.Forecast 34 KG/year: 34 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~60 days; expected demand during lead time 5.5.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
- 4.Stock 1,669 exceeds the level to keep (100) by 1,569.
Single sourceSame description as 3 other material numbers
On hand / on order
1,669 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 45
Rec. Max
100
order qty 50
Service level
99.4%
stockout risk now 0%
Unit price
Rp 39,386
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 288 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~30 days.
Installed on 1 functional locations
0 with criticality A/B · 3,000 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-110-BRN32 CONVECTION SECTION | C | 3,000 | 3 | 1.73 |
Lead time and procurement
Lead time 60 ± 27 days (PO history + category, 1 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 10 Jul 2026 | PR06 Regular replenishment | 41 | Rp 39,386 | 12 Sept 2026 | 64 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jul 2026 | Medium | PX_BF-110-BRN32 | Peep door broken BF-110-BRN32 |
| 11 Aug 2025 | Medium | PX_BF-110-BRN32 | Decoking follow up BF-110-BRN32 |
| 11 Aug 2025 | Low | PX_BF-110-BRN32 | Repair refractory crack BF-110-BRN32 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Dec 2025 | 50 | 201000038754 | Corrective |