Sparely
DU

CASTABLE,REFRACTORY,DENSE,1300DEG C

Material 4100073867 · CASTABLE · Plant 1000

AMonitorCritical insurance spare
Material
4100073867
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
MEGA ENERGI ABADI PT
Lead time
58 d · P80 71 d
Unit price
Rp 26,239

Recommendation

  • 1.Forecast 158 KG/year: 158 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 25.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 272, order up to 431.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidateSingle sourceSame description as 3 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
272
safety stock 247
Rec. Max
431
order qty 159
Service level
100.0%
stockout risk now 24%
Unit price
Rp 26,239
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 500 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A50011442.86

Lead time and procurement

Lead time 58 ± 27 days (PO history, 3 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
26 Jul 2026PR03
Regular replenishment
1Rp 26,12210 Sept 202646 d
02 Apr 2026PR03
Regular replenishment
1Rp 27,14929 Jun 202688 d
06 Jul 2025PR06
Regular replenishment
2Rp 26,23913 Aug 202538 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Never issued in the 17-month history.

Sparely