Sparely
DU

CASTABLE,REFRACTORY,DENSE,1600DEG C

Material 4100074010 · CASTABLE · Plant 1000

AReorderCriticalStockout
Material
4100074010
Category
CASTABLE
Base unit
KG
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 61,884 KG/year: 61,884 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 9,834.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 30,000, order up to 35,157.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 35,157 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100073384 holds spare stock: transfer 44 KG instead of buying, then buy the remaining 35113.
Proposed purchase requisition
35,113 KG
Rp 1.5B · order by 01 Oct 2026
Expected arrival ≈ 58 days
Needs Management sign-off before it reaches the PR draft
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
30,000
safety stock 20,167
Rec. Max
35,157
order qty 5,157
Service level
99.6%
stockout risk now 86%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 420 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 1,200 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A1,20011442.86

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
07 Aug 20255,000201000024523Corrective