CASTABLE,REFRACTORY,LW,1300DEG C

Material 4100074336 · CASTABLE · Plant 1000

SMonitorHealthy
Material
4100074336
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA LOGAM PRATAMA PT
Lead time
71 d · P80 109 d
Unit price
Rp 28,411

Recommendation

  • 1.Forecast 232 KG/year: 232 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~71 days; expected demand during lead time 45.
  • 3.A 77.3% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 283.
Single sourceOpen POSame description as 4 other material numbers
On hand / on order
102 / 17
next delivery 19 Oct 2026
Today Min / Max
21 / 63
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 6
Rec. Max
283
order qty 233
Service level
77.3%
stockout risk now 6%
Unit price
Rp 28,411
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 40 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~30 days.

Installed on 1 functional locations

0 with criticality A/B · 200 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-110
CRACKING FURNACE BF-110
S2004114.58

Lead time and procurement

Lead time 71 ± 41 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
20 Jul 2026PR06
Regular replenishment
6Rp 28,64209 Sept 202651 d
26 May 2026PR06
Regular replenishment
17Rp 27,03719 Oct 2026
open
146 d
17 Jan 2026PR06
Regular replenishment
20Rp 28,41111 Mar 202653 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
01 Sept 2026MediumPX_BF-110Replace burner tip BF-110
30 Aug 2026LowPX_BF-110Leak from packing
07 Aug 2026MediumPX_BF-110Install scaffolding at BF-110
07 Aug 2026MediumPX_BF-110Painting BF-110

Recent goods issues

Posting dateQtyOrderOrder type
22 Aug 202650201000002237Corrective