Sparely
DU

CASTABLE,REFRACTORY,INSUL,1300DEG C

Material 4100074361 · CASTABLE · Plant 1000

ATransferCriticalStockout
Material
4100074361
Category
CASTABLE
Base unit
KG
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 14 KG/year: 14 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 2.3.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 100 needed.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100073422 holds spare stock: transfer 100 KG instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 48
Rec. Max
100
order qty 50
Service level
99.9%
stockout risk now 4%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 318 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 183.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 1 functional locations

1 with criticality A/B · 50 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-101-DUCT24
PEEP DOOR
A5000.45

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
17 Nov 202550201000036543Corrective