CASTABLE,REFRACTORY,LW,1700DEG C

Material 4100074380 · CASTABLE · Plant 1000

AMonitorInsurance gap
Material
4100074380
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 211 KG/year: 211 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 34.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 272, order up to 483.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 6 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
272
safety stock 239
Rec. Max
483
order qty 211
Service level
99.9%
stockout risk now 31%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 43 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 3 functional locations

3 with criticality A/B · 3,250 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A2008230.86
PX_BF-103
CRACKING FURNACE BF-103
A3,0003814.58
PX_BF-104
CRACKING FURNACE BF-104
A502811.58

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.