Sparely
DU

CASTABLE,REFRACTORY,INSUL,1700DEG C

Material 4100074411 · CASTABLE · Plant 1000

AMonitorCritical insurance spare
Material
4100074411
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 97 KG/year: 97 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 15.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 181, order up to 278.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
181
safety stock 166
Rec. Max
278
order qty 97
Service level
99.9%
stockout risk now 16%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 16 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 683.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~30 days.

Installed on 2 functional locations

1 with criticality A/B · 3,025 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A3,0002911.58
PX_BF-110
CRACKING FURNACE BF-110
S254114.58

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_BF-110Replace burner tip BF-110
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
17 Sept 2026MediumPX_BF-110Install scaffolding at BF-110
15 Sept 2026MediumPX_BF-110Decoking follow up BF-110
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
11 Sept 2026MediumPX_BF-110Leak from packing
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-110Hot spot at convection BF-110
03 Sept 2026MediumPX_BF-110Thermograph wall BF-110
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.