Sparely
DU

CASTABLE,REFRACTORY,DENSE,1300DEG C

Material 4100074708 · CASTABLE · Plant 1000

SReducePotentially obsolete
Material
4100074708
Category
CASTABLE
Base unit
KG
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
58 d · P80 92 d
Unit price
Rp 43,840 (est.)

Recommendation

  • 1.Forecast 11 KG/year: 11 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~58 days; expected demand during lead time 1.8.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 9 exceeds the level to keep (0) by 9.
Convert to Non StockPrice estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
9 / 0
no open PO
Today Min / Max
4 / 12
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 2%
Unit price
Rp 43,840
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 283,399/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~30 days.

Installed on 1 functional locations

0 with criticality A/B · 3,000 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-101
CRACKING FURNACE BF-101
S3,00083.02

Lead time and procurement

Lead time 58 ± 27 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing
02 Jun 2025LowPX_BF-101Install cover plate BF-101

Recent goods issues

Never issued in the 17-month history.